ML19257C452

From kanterella
Jump to navigation Jump to search
Forwards IE Circular 80-01, Svc Advice for GE Induction Disc Relays. No Response Required
ML19257C452
Person / Time
Site: 05000580, 05000581
Issue date: 01/17/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Barry Miller
OHIO EDISON CO.
References
NUDOCS 8001290149
Download: ML19257C452 (1)


Text

If[h

    • a t coq'o, UNITED STATES

/

NUCLEAR REGULATORY COMMISSION

!" 3

(

g

~

REGION 111 a

799 ROOSEVELT ROAD o,

,o[

GLEN ELLYN, ILLINOIS 60137 g '.U Docket No. 50-580 Docket No. 50-581 The Ohio Edison Company ATTN:

Mr. B. M. Miller Manager, Generating Plant Engineering 76 South Main Street Akron, OH 44308 Gentlemen:

The enclosed IE Circular No. 80-01 is forwarded to you for information and if applicable necessary action in accordance to the attached General Electric Company Service Advice 721-162.2. No written response to this Circular is required.

If you have any questions related to the subject, please contact this office.

Sincerely,

%b$W

(/ James G. Keppler Director

Enclosures:

1.

IE Circular No. 80-01 2.

GE Service Advice 721-162.2 cc w/encls:

Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC Harold W. Kohn, Power Siting Commission

~

1832.555~

8001290

/4G