ML19257C446
| ML19257C446 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 01/17/1980 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Hines E DETROIT EDISON CO. |
| References | |
| NUDOCS 8001290134 | |
| Download: ML19257C446 (1) | |
Text
'c.
UNITED STATES
^,
NUCLEAR REGULATORY COMMISSION
).nE REGION lli 3
k 5
5 799 ROOSEVELT RC AD o
% 'A/
8 o
GLEN ELLYN, ILLINOIS 60137 JAN 17 580 Docket No. 50-341 The Detroit Edison Company ATTN:
Mr. Edward Hines, Assistant Vice President and Manager Quality Assurance 2000 Second Avenue Detroit, MI 48226 Gentlemen:
The enclosed IE Circular No. 80-01 is forwarded to you for information and if applicable necessary action in accordance to the attached General Electric Company Service Advice 721-162.2.
No written response to this Circular is required.
If you have any questions related to the subject, please cortact this office.
Sincerely, bM FJames G. Keppler Director
Enclosures:
1.
IE Circular No. 80-01 2.
GE Service Advice 721-162.2 cc w/encls:
Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Eugene B. Thomas, Jr.,
Attorney o.
1832 349 g
8001290 /3e/