ML19257C446

From kanterella
Jump to navigation Jump to search
Forwards IE Circular 80-01, Svc Advice for GE Induction Disc Relays. No Response Required
ML19257C446
Person / Time
Site: Fermi 
Issue date: 01/17/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hines E
DETROIT EDISON CO.
References
NUDOCS 8001290134
Download: ML19257C446 (1)


Text

'c.

UNITED STATES

^,

NUCLEAR REGULATORY COMMISSION

).nE REGION lli 3

k 5

5 799 ROOSEVELT RC AD o

% 'A/

8 o

GLEN ELLYN, ILLINOIS 60137 JAN 17 580 Docket No. 50-341 The Detroit Edison Company ATTN:

Mr. Edward Hines, Assistant Vice President and Manager Quality Assurance 2000 Second Avenue Detroit, MI 48226 Gentlemen:

The enclosed IE Circular No. 80-01 is forwarded to you for information and if applicable necessary action in accordance to the attached General Electric Company Service Advice 721-162.2.

No written response to this Circular is required.

If you have any questions related to the subject, please cortact this office.

Sincerely, bM FJames G. Keppler Director

Enclosures:

1.

IE Circular No. 80-01 2.

GE Service Advice 721-162.2 cc w/encls:

Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Eugene B. Thomas, Jr.,

Attorney o.

1832 349 g

8001290 /3e/