ML19257C389
| ML19257C389 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 12/20/1979 |
| From: | Davis A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML19257C390 | List: |
| References | |
| NUDOCS 8001290038 | |
| Download: ML19257C389 (2) | |
See also: IR 05000295/1979025
Text
oy'o
Tic
.
Sa asc
UNITED STATES
8 ' 3,(
NUCLEAR REGULATORY COMMISSION
~
n
$
.E
REGION lli
o,
?-
'
[
799 ROOSEVELT ROAD
% (# p
GLEN ELLYN, ILLINOIS 60137
DEC 2 01979
Docket No. 50-295
Docket No. 50-304
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
_
This refers to the inspection conducted by Messrs. L. R. Greger and C. C. Peck
of this office on November 19 and 20, 1979, of activities at Zion Nuclear
Power Station, Units 1 and 2, authorized by NRC Operating Licenses No. DPR-39
and No. DPR-48 and to the discussion of our findings with Mr. N. Wandke and
others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, indepen-
dent measurements, and interviews with personnel.
The inspection included an examination of the radioactive waste shipment which
departed your site on November 20, 1979, as agreed with the State of South
Carolina Department of Health and Environmental Control.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
Based on discussions with your representatives at the site, we understand
that the program reviews and revisions described in Item 5 of Attachment A
to your September 21, 1979, letter from D. L. Peoples to J. G. Keppler will
be completed by January 18, 1980, and that the revised programs will be
implemented by March 31, 1980.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room, except as
follows.
If this report contains information that you 3r your contractors
believe to be proprietary, you must apply in writing to this office, within
twenty days of your receipt of this letter, to withhold such information from
182d 012
8001290
0:3g
.
DEC 2 0197f
Commonwealth Edison Company
-2_
public disclosure. The application must include a full statement of the reasons
for which the information is considered proprietary, and should be prepared so
that proprietary information identified in the application is contained in an
enclosure to the application.
We will gladly discuce any questions you have concerning this inspection.
Sincerely,
,.-
f.
W
A. B. Davis, Chief
Fuel Facility and
Materials Safety-Branch
Enclosure:
IE Inspection
Reports No. 50-295/79-25
and No. 50-304/79-23
cc w/ encl:
Mr. D. L. Peoples, Director
of Nuclear Licensing
Mr. N. Wandke, Plant
Superintendent
Central Files
Reproduction Unit NRC 20b
Local PDR
Mr. Dean Hansell, Office of
Assistant Attorney General
18g013