Forwards IE Insp Repts 50-295/79-25 & 50-304/79-23 on 791119-20.No Noncompliance Noted
ML19257C389
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 12/20/1979
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML19257C390 List:
References
NUDOCS 8001290038
Download: ML19257C389 (2)


See also: IR 05000295/1979025

Text

oy'o

Tic

.

Sa asc

UNITED STATES

8 ' 3,(

NUCLEAR REGULATORY COMMISSION

~

n

$

.E

REGION lli

o,

?-

'

[

799 ROOSEVELT ROAD

% (# p

GLEN ELLYN, ILLINOIS 60137

DEC 2 01979

Docket No. 50-295

Docket No. 50-304

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

_

This refers to the inspection conducted by Messrs. L. R. Greger and C. C. Peck

of this office on November 19 and 20, 1979, of activities at Zion Nuclear

Power Station, Units 1 and 2, authorized by NRC Operating Licenses No. DPR-39

and No. DPR-48 and to the discussion of our findings with Mr. N. Wandke and

others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, indepen-

dent measurements, and interviews with personnel.

The inspection included an examination of the radioactive waste shipment which

departed your site on November 20, 1979, as agreed with the State of South

Carolina Department of Health and Environmental Control.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

Based on discussions with your representatives at the site, we understand

that the program reviews and revisions described in Item 5 of Attachment A

to your September 21, 1979, letter from D. L. Peoples to J. G. Keppler will

be completed by January 18, 1980, and that the revised programs will be

implemented by March 31, 1980.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room, except as

follows.

If this report contains information that you 3r your contractors

believe to be proprietary, you must apply in writing to this office, within

twenty days of your receipt of this letter, to withhold such information from

182d 012

8001290

0:3g

.

DEC 2 0197f

Commonwealth Edison Company

-2_

public disclosure. The application must include a full statement of the reasons

for which the information is considered proprietary, and should be prepared so

that proprietary information identified in the application is contained in an

enclosure to the application.

We will gladly discuce any questions you have concerning this inspection.

Sincerely,

,.-

f.

W

A. B. Davis, Chief

Fuel Facility and

Materials Safety-Branch

Enclosure:

IE Inspection

Reports No. 50-295/79-25

and No. 50-304/79-23

cc w/ encl:

Mr. D. L. Peoples, Director

of Nuclear Licensing

Mr. N. Wandke, Plant

Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Mr. Dean Hansell, Office of

Assistant Attorney General

18g013