Text
.
.
. .
gn neo
UNITED STATES
- o
NUCLEAR REGULATORY COMMISslON
[
REGIGNI
o
$
.j
$31 PARK AVENUE
'
KING OF PRUS$1 A, PENNSYLVANIA 19406
% ..... /
Docket No. 50-423
AUG 2 91979
Northeast Nuclear Energy Company
ATTN: Mr. W. G. Counsil
Vice President - Nuclear
Engineering Operations
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject:
Inspection 50-423/79-05
This refers to the inspection conducted by Mr. A. Toth of this office on June 4-
8,1979 at the Millstone Nuclear Power Station Unit 3, Waterford, Connecticut of
activities authorized by NRC License No. CPPR-113 and to the discussions of our
findings held by Mr. A. Toth with Mr. S. Toth at the conclusion of the inspcction.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Within the scope of this inspection, no items of noncompliance were observed.
However, certain activities appear to be deviations from commitments described
in the Preliminary Safety Analysis Report for the Millstone Point Nuclear Station
Unit 3.
These items involve welding controls relative to NRC Regulatory Guides
1.31 and 1.44.
Details are described in Paragraph 4.a(1) and 4.a(2) of the
enclosed inspection report.
Please provide this office a description of your plans for resolving these
deviations, including your schedule and measures as appropriate to control
similar occurrences.
Your response is requested within 30 days of your receipt
of this letter.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room.
If this report contains
1808
021
8001250l SP
.
. .
.
Northeast Nuclear Energy Co.
2
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such infomation from public disclosure. Any such application must be
accompanied by an affidavit executed by the owner of the information, which
identifies the document or part sought to be withheld, and which contains a
statement of reasons which addresses with specificity the items which will be
considered by the Comission as listed in subparagraph (b)(4) of Section 2.790.
The infomation sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specified period, the report will be placed in the Public
Document Room.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
I
N
Robert T. Car s
Chief
Reactor Construction and Engineering
Support Granch
Enclosure: Office of Inspection and Enforcement Inspection
Report Number 50-423/79-05
cc w/ encl:
K. W. Gray, Construction Quality Assurance Lead
H. R. Nims, Director of Nuclear Projects
J. F. Opeka, Station Superintendent
J. R. Himmelwright, Licensing Safeguards Engineer
1808
022