ML19257B776

From kanterella
Jump to navigation Jump to search
Forwards LER 79-036/03L-0
Date released: 09/28/2019 Download: ML19257B776


LER 79-036/03L-0:on 791219,during Testing of Reactor Core Isolation Cooling High Steam Line Differential Pressure Switches,Differential Pressure Switch Actuated at -196 Inches of Water.Caused by Setpoint Drift.Switch Adjusted
ML19257B778
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 01/15/1980
From: Conway W
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19257B778 (2)
Forwards LER 79-036/03L-0
ML19257B775
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 01/15/1980
From: Conway W
VERMONT YANKEE NUCLEAR POWER CORP.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19257B775 (1)