ML19257B752
| ML19257B752 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 01/04/1980 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Howell S CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| References | |
| NUDOCS 8001180257 | |
| Download: ML19257B752 (1) | |
Text
.
b pa "8 Gut UNITED STATES
,, w
..g NUCLEAR REGULATORY COMMISSION f
k$
799 ROOSEVELT ROAD REGION 111 g
4 y
CLEN ELLYN, ILLINOIS 60137
.o'A W(
Docket No. 50-329 Docket No. 50-330 Consumers Power Company ATTN:
Mr. Stephen H. Howell Vice President 1945 West Parnall Road Jackson, MI 49201 Gentlemen:
Thank you for your interim report dated December 13, 1979, pursuant to 10 CFR 50.55(e) regarding in-containment coatings which have a loss of adhesion between successive layers of the coating system. We will review your final report on this matter upon receipt.
Your cooperation with us is appreciated.
Sincerely, N
M' Gaston Fiorelli, Chief
/
Reactor Construction and Engineering Support Branch cc:
Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Dr. Wayne E. N'.cth Myron M. Cherry, Chicago
[770 057 b
8001180 2