ML19257B720
| ML19257B720 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 10/31/1979 |
| From: | William Jones OMAHA PUBLIC POWER DISTRICT |
| To: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| IEB-79-24, NUDOCS 8001180201 | |
| Download: ML19257B720 (1) | |
Text
- -~
~~ -~
CENTRAL FILES PDR:HQ LPDR
~
~
~
Omaha Public Power District 1623 HARNEY e OMAHA, NESRASMA 68102 m TELEPHONE 536-4000 AREA CODE 402 October 31, ~.979 Mr. K. V.
Seyfrit, Director U.
S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region IV 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76011
Reference:
Docket No. 50-285
Dear Mr. Seyfrit:
The Omaha Public Power District received IE Bulletin 79-24, dated September 27, 1979, requesting that a review of the Fort Calhoun Station be conducted to determine that adequate protective measures have been taken to assure that safety-related process, instrument, and sampling lines do not freeze during extremely cold weather.
In response, the District has conducted the required review and found that all of these lines are located either in heated buildings or buried in the ground well below the frost line.
As such, freezing of lines associated with safety systems is not expected.
Sincerely,
- C 0 l
^')L &
W. C. Jones Division Manager Production Operations WCJ/KJM/BJH:jmm cc: