Responds to IE Bulletin 79-24, Frozen Lines. All safety-related Process,Instrument & Sampling Lines Located in Heated Bldgs or Buried in Ground Below Frost Line.Lines Associated W/Safety Sys Not Expected to Freeze
ML19257B720
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 10/31/1979
From: William Jones
OMAHA PUBLIC POWER DISTRICT
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
IEB-79-24, NUDOCS 8001180201
Download: ML19257B720 (1)


Text

- -~ ~~ -~

CENTRAL FILES PDR:HQ LPDR

.ATC NSIC

~

~

~

Omaha Public Power District 1623 HARNEY e OMAHA, NESRASMA 68102 m TELEPHONE 536-4000 AREA CODE 402 October 31, ~.979 Mr. K. V. Seyfrit, Director U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region IV 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76011

Reference:

Docket No. 50-285

Dear Mr. Seyfrit:

The Omaha Public Power District received IE Bulletin 79-24, dated September 27, 1979, requesting that a review of the Fort Calhoun Station be conducted to determine that adequate protective measures have been taken to assure that safety-related process, instrument, and sampling lines do not freeze during extremely cold weather. In response, the District has conducted the required review and found that all of these lines are located either in heated buildings or buried in the ground well below the frost line. As such, freezing of lines associated with safety systems is not expected.

Sincerely,

C 0 l ^')L &

W. C. Jones Division Manager Production Operations WCJ/KJM/BJH:jmm cc: LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, N. W.

Washington, D. C. 20036 1769 181 8001180 &ol h