UNITED STATES
,g
3
NUCLEAR REGULATORY COMMISSION
~
$
E
REGION 11
,
o
101 MARIETT A ST., N.W., SUITE 3100
b
ATLANTA, G EORGIA 3o303
g.....o
NOV 3 01979
In Reply Refer To:
RII:GTG
50-327/79-69
Tennessee Valley Authority
ATTN:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
This refers to the inspection conducted by G. T. Gibson of this office on-
October 28-29 and November 20, 1979, of activities authorized by NRC Operating
License No. CPPR-72 for the Sequoyah Nuclear facility, and to the discussion of
our findings held with Messrs. J. Green, J. Calhoun and E. Belvin at the con-
.,
clusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and tt.
anclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Docun.2nt Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
.
(
Y
-
'
J. T. Sutherland, Chief
d Fuel Facility and Materials
Safety Branch
Enclosure:
(See Page 2)
1767
320
oO
-
8001180
NOV 3 01979
.
Tennessee Valley Authority
-2-
,
Enclosure:
Inspection Report No. 50-327/79-69
cc w/ enc 1:
G. G. Stack, Project Manager
P. O. Box 2000
Daisy, TN 37319
J. M. Ballentine
Plant Superintendent
P. O. Box 2000
Daisy, TN 37319
J. F. Cox
400 Commerce Street
W10C131 C-K
Knoxville, TN 37902
D. L. Lambert, Project Engineer
400 Chestnut Street Tower II
Chattanooga, TN 37401
E. G. Beasley
Tennessee Valley Authority
309 Grant's Building
Knoxville, TN 37902
Dr. E. W. Fowiakle
Commissioner of Public Health
State of Tennessee
Room 344
Cordell Hull Building
Nashville, TN 37219
Major General C. D. Wallace
Adjutant General
State of Tennessee
National Guard Armory
Sidco Drive
Nashville, TN 37204
W. P. DeBrock, Director
Hamilton County Civil Defense
Suite B18
Justice Building
Chattanooga, TN 37402