ML19257B369

From kanterella
Jump to navigation Jump to search
Forwards LER 79-109/01T-0
Date released: 09/28/2019 Download: ML19257B369


LER 79-109/01T-0:on 791228,while Capping Reactor Recirculation Pump 3/4-inch Suction Test Connection,Leak Found in Base Metal of Reducing Insert Upstream.Possibly Caused by Weld Arc Strike on Reducing Insert.Line Plugged
ML19257B379
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 01/10/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19257B379 (2)
Forwards LER 79-109/01T-0
ML19257B368
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 01/10/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19257B368 (1)