05000346/LER-1979-129-03, /03L-0:on 791211,during Control Room Emergency Vent Sys 18-month Test ST 5076.02,charcoal Filter Bank in Unit 1-2 Failed to Meet Required Efficiency.Caused by Leak Between Filter Plate & Assembly.Plate Nuts Properly Torqued

From kanterella
(Redirected from ML19257B308)
Jump to navigation Jump to search
/03L-0:on 791211,during Control Room Emergency Vent Sys 18-month Test ST 5076.02,charcoal Filter Bank in Unit 1-2 Failed to Meet Required Efficiency.Caused by Leak Between Filter Plate & Assembly.Plate Nuts Properly Torqued
ML19257B308
Person / Time
Site: Davis Besse 
Issue date: 01/08/1979
From: Bernard Thomas
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19257B302 List:
References
LER-79-129-03L, LER-79-129-3L, NUDOCS 8001150546
Download: ML19257B308 (2)


LER-1979-129, /03L-0:on 791211,during Control Room Emergency Vent Sys 18-month Test ST 5076.02,charcoal Filter Bank in Unit 1-2 Failed to Meet Required Efficiency.Caused by Leak Between Filter Plate & Assembly.Plate Nuts Properly Torqued
Event date:
Report date:
3461979129R03 - NRC Website

text

U. S. NUCLE AR REGULATORY COMMISSION NRC FORM 3GG (7 77)

LICENSEE EVENT REPORT CONTROL OLOCK: l l

l l

l l

l (PLEASE PRINT OR TYPE alt REQUIRED INFORMATION) t 6

lo l 1 l l 0 l H l D l B l S l 1 l@[ 0 l 0 l - l 0 l 0 NlPlF

- l 0 l 3 l@l 4 1 l 1 l 1 l 1 l@l l

l@

7 8 9 LICEP.5EE COGE 14 15 LICENSE NU'.!dEH 25 26 LICENSE TY PE JO 51 CAT 58 CON'T "E"y l L l@l 0 l 5 l 0 l - l 0 l 3 l 4 l 6 l@l 1 l 2 l 1 l1 l 719 l@l 0 l 1 l 018 l 8101@

o i

3g 7

8 CJ 61 COCKET NU'.teER ti8 69 EVENT DATE 74 75 REPORT D AT E 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h o

2 lOn December 12, 1979 during the performance of ST 5076.02, Control Room Emernency I

] Ventilation System (EVS) 18 Month Test, the charcoal filter bank in EVS Unit 1-2 l

o 3

l failed to meet the required efficiency as listed in Technical Specification 4.7.6.1.

I o

4 1Being in Mode 5 at the time of the occurrence, the station did not enter an action I

o s

o 6 l statement. This is being reported to document a component failure. There was no j

l o l 7 l l danger to the health and safety of the public or station personnel. The redundant I

I train was operable had it been required.

(NP-33-79-150) l o

e SYSTEV

CAUSE

CAUSE COMP.

VALVE CODE CODE SUBCODE COMPONENT CODE SUBCODE SUSCODE lol9l lSlG @ l E l@ l B @ l Bl L 0l Wl El Rlh W@ l Z l @

7 8

9 10 11 12 13 18 19 20 SEQUENTI AL OCCURRENCE REPORT REVISION LE R /RO EVENT YEAR REPORT NO.

CODE TYPE N O.

l7 l9 l

[___j l 1l 2l 9) lp]

l 0] 3 l lLl

[]

l0 l

@ REP RT

_ 21 22 23 24 26 21 23 23 30 31 32 T

ET HOURS 22 S B IT t F O)'

S 8.

SU PLIE P.9 A P F T FER 7

A T O.PLA l B l g ]34g

]33g

'l35 Zl@

l0 l0 0

D l Yl@

l Yl@

y@

lB 0 l7 l5 l@

3/

40 41 42 43 44 47 33 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h lThe cause of the low filter efficiency was leakage between the filter plate and the i

o lilij l assembly. This leakage was due to insufficient pressure applied to the nasket. Underl

[,;7; l Maintenance Work Order 79-3755, the nuts holding the plate to the assembly were 1

[ig3l l torqued to 75 in-lbs.

The unit then successfully met the requirements of ST 5076.02 l

1 on December 17, 1979.

l 1

4 80 7

8 0

  • POWE R OTHER STATUS SCOV RY DISCOVERY DESCRIPTION A s W@ l 0l 0 0l@]

NA l

B l@l unable to meet test limit l

i 5

ACTIVITY CO TENT RELEASED OF RELE ASE AVOUNT OF ACTIVITY LOCATION OF RELEASE NA l

l NA l

l Z l @ J@

i 6

7 8 9 10 11 44 45 80 PERSONNEL EXPOSURES NUY8ER TYPE

DESCRIPTION

1010101@l 4@l NA l

i 7

PE RsOw/t iNauWiES DEsCmPTiON@

Nu m R.

1010101@l NA l

i a

80 7

8 9 11 12 LOSS OF OR DAYAGE TO FACILtTY TYPE

DESCRIPTION

tzj gi NA i s 80 7

8 9 to NRc usE e

"*lCwTioNO O001150 l 2 l 0 l [Jd['hl NA l

llllll lllllt2 DE mu 68 69 E0 ;

7 8 9 10 DVR 79-196 NAME OF PREPARER

TOLEDO EDISON COMPANY DAVIS-BESSE NUCLEAR POWER STATION UNIT ONE SUPPLEMENTAL INFORMATION FOR LER NP-33-79-150 DATE OF EVENT: December 11, 1979 FACILITY: Davis-Besse Unit 1 IDENTIFICATION OF OCCURRENCE: Control Room Emergency Ventilation System (EVS)

Train 1-2 Charcoal Bank F22-2 failed due to low efficiency Conditions Prior to Occurrence: The unit was in Mode 5, with Power (MWT) = 0, and Load (Gross MWE) = 0.

Description of Occurrence: While performing ST 5076.02, Control Room EVS 18 Month Test, the charcoal filter bank in Control Room EVS Unit 1-2 failed to meet Surveil-lance Technical Specification 4.7.6.1.g which requires, during Modes 1 through 4, each unit remove ?_99% of the test gas while operating the system at a flow rate of 3300 cfm 10%.

Since the station was in Mode 5 at the time of the occurrence, the unit did not enter into an action statement.

This is being reported to document a component failure.

Designation of Apparent Cause of Occurrence: The cause of the filter low efficiency was leakage located between the filter plate and assembly. The cause of this leak-age was due to insufficient plate / assembly pressure applied to the gaskets which could have been induced by normal vibration.

Analysis of Occurrence: There was no danger to the health and safety of the public or to station personnel. The redundant Control Room EVS Train 1-1 was operable.

Corrective Action

The nuts of the filter cells were torqued under Maintenance Work Order 79-3755 on December 17, 1979. This provided the necessary seal. On December 17, 1979, ST 5076.02 was performed successfully. A procedure change will be made to prevent a similar occurrence by requiring that the nuts to the filter cells be torqued to 75 in-lbs and a light source leak test be performed following the removal and re-assembly of the filter. This ST 5076.02, Control Room EVS 18 Month Test, is always used following any Control Room EVS work to ensure operability after mainten-ance.

Failure Data: There have been no previous similar reportable occurrences.

LER #79-129 1749 074