ML19257B243
| ML19257B243 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 11/16/1979 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML19257B242 | List: |
| References | |
| 50-010-79-22, 50-10-79-22, 50-237-79-26, 50-249-79-24, NUDOCS 8001150403 | |
| Download: ML19257B243 (1) | |
Text
.
Appendix A NOTICE OF VIOLATION Commonwealth Edison Company Docket No. 50-249 Based on the inspection conducted on October 1-November 2, 1979, it appears that certain of your activities were in noncompliance with NRC requirements, as noted below. This item is an infraction.
Unit 3 Technical Specifications, Section 6.2.A requires that detailed pro-cedures involving operation of components involving nuclear safety of the facility be prepared, approved, and adhered to.
Licensee procedure DOP 2000-2-M1, "A and B Waste Collector Filters Manual Valve Line-up Check-lists," delineates the proper valve line-up for A and B Waste Collector System operations.
Contrary to the above, on October 25, 1979, a licensee employee (an unqual-ified equipment attendant) failed to make valving evolutions in accordance with D0P 2000-2-M1, which resulted in the werfilling of the Unit 3 spent fuel pool and subsequent contamination of the Unit 3 Reactor Building with low leve. radioactive material.
1749 173 8001150 YBJ