ML19257A878

From kanterella
Jump to navigation Jump to search
Forwards LER 79-108/03L-0
Date released: 09/28/2019 Download: ML19257A878


LER 79-108/03L-0:on 791211,during Normal Plant Operation, Drywell Pressure Indicator CAC-PI-3341 Was Reading 3 Psig W/Normal Pressure of 0.5 Psig.Caused by Indicator Zero Being Out of Tolerance.Indicator Recalibr
ML19257A880
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 01/03/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19257A880 (1)
Forwards LER 79-108/03L-0
ML19257A877
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 01/03/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19257A877 (1)