ML19257A863

From kanterella
Jump to navigation Jump to search
Forwards Corrected Cover Page for IE Bulletin Re Pressure Switch Failures.W/O Encl
ML19257A863
Person / Time
Site: 05000418
Issue date: 11/07/1979
From: Lainas G
Office of Nuclear Reactor Regulation
To: Jordan E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML19257A864 List:
References
NUDOCS 8001090252
Download: ML19257A863 (1)


Text

-

j*

UNITED STATES c'

7, NUCLEAR REGULATORY COMMISSION j

  • ' (

j WASHINGTON, D. C. 20555 e

\\, '...../

NOV 7 1979 MEMORANDUM FOR:

E. Jordan, Assistant Director Division of Reactor Operations Inspection Office ;f Inspection and Enforcement FROM:

G. Lainas, Chief Plant Systems Branch Division of Operating Reactors

SUBJECT:

CORRECTION TO MEMORANDUM 0F OCTOBER 24, 1979 REGARDING PRESSURE SWITCH FAILURES AT OHI 1 By memorandum dated October 24,1979 (Proposed IE Bulletin Notice:

Pressure Switch Failure - OHI 1), we informed you of the failure of a Westinghouse supplied pressure switch at the OHI 1 Nuclear Power Plant.

The subject of this memorandum should have read " Proposed IE Information Notice: Pressure Switch Failure - OHI 1."

The proposed IE Information Notice enclosed with the October 24, 1979 memo is correct.

The corrected cover page is enclosed.

G. Lainas, Chief Plant Systems Branch Division of Operating Reactors

Enclosure:

As stated

Contact:

R. Kendall, X28218 cc w/ enclosure:

D. Eisenhut R. Satterfield F. Rosa G. Lainas V. Thomas D. Tondi R. Kendall 1707 095 8 0 010 90 Z 5