ML19257A489
| ML19257A489 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 12/03/1979 |
| From: | Jay Collins NRC - TMI-2 OPERATIONS/SUPPORT TASK FORCE |
| To: | Wilson R METROPOLITAN EDISON CO. |
| Shared Package | |
| ML19257A486 | List: |
| References | |
| NUDOCS 8001040449 | |
| Download: ML19257A489 (3) | |
Text
.... '
mm o
@W.
w
- a
(
'l' DISTRIBUTION:
~~
DEC 3 1979 SEP r/f PSB r/f 50-320, TMI r/f 4 M
NRR r/f CENTRAL FILE th. Richard F.~ Ullson, Director NRC PDR TMI Unit-2 JTCOLLINS Local P61-Metropolitan-Edison Company P. O. Box 480 Hiddletown, PA 17057
Dear Mr.' Wilson:
_ ~
. ~
Over ttie past several weeks,' members of my staff have. requested from your staff information regarding schedules for completing various reports relative to the recovery program andlhave met with little or no success.
~ This information is of utmost importance to us, so that we can proceed x
with the development of the environmental assessments required by the Comission Order of May 25 and more recently, by the Policy Statement on The Preparation Of An Environmental Impact For The Recovery Program issued by the Cocraission on flovember 21, 1979..
In this regard. I have attached to this letter a list of projects for which I would like to have your best estimate as to when you expect to
~
,m, submit this information to the ilRC.for review. Your timely response to
(
this request would be appreciated.
V Sincerely, John T. Collins Deputy Director THI Support
Enclosure:
List of Projects cc:
J. G. Herbein, Vice President f uclear Operations'
~
E. G. Wallace, Manager Licensing.
G. P. f*1iler, Manager Support Services and Logistics
{
J. B. Logan, Superintendent Unit 2 G. A. Kunder, Unit 2 Superjyltendent -pYechnical Support J. J. Colitz, Manager Plant Engineering R. F. Wilson, Director THI-2 Recovery, Acting I. R. Finfrock, Jr.
R. W. Conrad G. F. Trowbridge, Esquire
~
R. C. Arnold, Senior Vice President I
1_
1687 078
~
'"I JTCollins:si 11/ /79 8001040 h
', C Mr. Richard F. Wilsong Director -
[cccontinued:
\\
J. B. Lieberman, Esquire Ms. Mary V. Southard, Chairperson, Citizens for a Safe Environment R. Vollmer E. Fuller-Met-Ed
~
bcc:
IE Mail & Files (For Appropriate Distribution)
Central Files Public Document Room (PDR) '(LPDR)
~ ~
Local Public Document Room fluclear Safety Information Center (t1 SIC)
Technical Information Center (Tico Reg;1 Reading room Connonwealth of Pennsylvania Es. Mary V. _Southhrd, Chairperson, Citizens for a Safe Environment q..
~
~g
-'i
's
~
1687 079
-a
ATTACHMENT 1 LIST OF PROJECTS FOR WilICH INPUT IS REQUIRED BY MET-ED/GPil 1.
Documentation of dewatering study for EPICOR-I resin liners.
2.
Formal response from Met-Ed on disposition of processed water from TMI-2.
3.
Proposed methods for processing the higher activity waters in the primary system and containment building (Submerged Demineralizer System) 4.
Proposed method for processing the decon solutions generated from cleanup of the containment building and primary system (Evaporator / Solidification Systems).
5.
Proposed method for solidifying resins from EPICOR-II.
7.
Proposed schedule for installing monitoring well around TMI-2 containment building.
8.
Program plan for processing water in auxiliary buil, ding.
9.
Program for storing water after processing.
(
- ~ 10.
Documentation of resin column studies for submerge"d demineralizer system.
11.
Documentation of EPICOR-II performance.
- 12. Long-term plan for storing solid radwaste on-s.ite other than EPICOR-II liners.
13.
Proposed program for auxiliary building sump and associated tanks.
- 14. Documentation of HEPA/ Charcoal change out in auxiliary Suilding/ fuel handling building.
- 15. Status of fire protection for solid radwaste on-site storage facility (Paint Shed).
1687 080-4
-y w-eee
.-,w-g#48