Forwards IE Insp Repts 50-518/79-26,50-519/79-26, 50-520/79-26 & 50-521/79-26 on 791029-31.No Noncompliance Noted
ML19257A376
Person / Time
Site: Hartsville  
Issue date: 11/21/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19257A377 List:
References
NUDOCS 8001030887
Download: ML19257A376 (2)


See also: IR 05000518/1979026

Text

asog

g

8

UNITED STATES

!

NUCLEAR REGULATORY COMMISSION

cY -d

'

o

A[I

5

,E

REGION 11

88

.

.

o

101 MARIETTA ST

N.W.. SUITE 3100

gg,

.

8

g

j

ATLANTA. GEORGIA 30303

In Reply Refer To:

RII:DKW

50-518/79-26

50-519/79-26

50-520/79-26

50-521/79-26

Tennessee Valley Authority

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

This refers to the inspection conducted by D. K. W.1ters of this office on

October 29-31, 1979, of activities authorized by NRC Construction Permit Nos.

CPPR-150, CPPR-151, CPPR-152, CPPR-153 for the Hartsville Nuclear facility, and

to the discussion of our findings held with R. T. Hathcote at the conclusion of

the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspect ar.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and suould be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the spe-ified period, the report will be plar ed in the Public Document Room.

1671

249

Booloso <Yf 9

.

NOV 211979

'

Tennessee Valley Authority

-2-

.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

.

f

/

.

C. E. Murp y, Chie

'

Reactor Construction and Engineering

Support Branch

Enclosure:

Inspection Report Nos. 50-518/79-26,

50-519/79-26, 50-520/79-26 and 50-521/79-26

cc w/ enc 1:

R. T. Hathcote, Project Manager

P. O. Box 2000

Hartsville, TN 37074

.

J. F. Cox

400 Commerce Street

W10C131 C-K

Knoxville, Tennessee

37902

J. E. Wills, Project Engineer

400 Chestnut Street Tower II

Chattanooga, TN 37401

E. G. Beasley

1671

250

Tennessee Valley Authority

309 Grant's Building

Knoxville, Tennessee 37902

,