ML19257A319
| ML19257A319 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 11/21/1979 |
| From: | Dutton D GEORGIA POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19257A320 | List: |
| References | |
| GM-527, NUDOCS 8001030729 | |
| Download: ML19257A319 (2) | |
Text
.
e I
Georgia Power Cormany Ii3 l -
Post Omce Box 4545 hm Atlanta, Georgia 3o3o2 mm 404 522e Vogtle Project I..,, 2
'a Southern Cormany Serwces, Inc.
J.*
Post Omce Box 2625 Barmngham, Alabama 35202 Telephone 205 870-6o11 November 21, 1979 United States Nuclear Regulatory Commission File:
X7BG03 Office of Inspection and Enforcement Log: GM-527 Region II - Suite 3100 101 Marietta Street, NW Atlanta, GA 30303 Attention:
Mr. James P. O'Reilly
Reference:
50-424; 50-425 Gentlemen:
As previously reported in our letter of October 8,1979, Georgia Power Company is submitting a final report on the potential significant deficiency evaluation conducted for the embed plates at Plant Vogtle.
In evaluating the embed plate assemblies for a potential significant deficiency, an evaluation was also made per 10CFR21 requirements.
This response contains no proprietary information and may be placed in the NRC Public Document Rooms upon receipt.
@ y truly g rs, Ver k
&M N
Doug Dutton Project General Manager CWH:db
- b cc:
U. S. Nuclear Regulatory Commission Attn:
John G. Davis, Acting Director Office of Inspection and Enforcement Washington, DC 20555 g
M. D. Hunt, NRC Region II 6
wom viiiCIAL CM i g
001030 % f 8
United States Nuclear Regulatory Commission Gil-527 November 20, 1979 Page 2 xc:
J. H. Miller, Jr.
W. E. Ehrensperger F. G. Mitchell, Jr.
R. J. Kelly C. F. Whitmer R. E. Conway D. E. Dutton J. T. Beckhar., Jr.
R. W. Staffa K. M. Gillespie L. T. Gucwa C. R. Miles, Jr.
E. D. Groover D. L. McCrary R. A. Thomas
- 0. Batum J. A. Bailey M. Z. Jeric B. L. Lex 1668 317
.