Forwards Insp Results Re Response to IE Bulletin 79-13, Revision 2, Cracking in Feedwater Sys Piping. No Indication of Cracking Problems in Feedwater Nozzles or Piping Weld Areas
ML19257A110
Person / Time
Site: North Anna Dominion icon.png
Issue date: 12/04/1979
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-79-13, NUDOCS 8001020113
Download: ML19257A110 (2)


Text

.

pc ,

$0-339

, VanGINIA ELecTnic Ann Pownn Courswr It a cisw on n.Vx uorwz A 20261 December 4, 1979 [- c . ll

  • 01 Mr. James P. O'Reilly, Director Serial No. 865/101779 A Office of Inspection and Enforcement P0/FHT:baw U. S. Nuclear Regulatory Commission Docket No. 50-338 Region II License No. NPF-4 101 Marietta Street, Suite 3100 A*tlanta, Georgia 30303

Subject:

IE Bulletin 79-13 Revision 2 North Anna Unit 1 Inspection Results

Dear Mr. O'Reilly:

In response to the subject bulletin, " Cracking in Feedwater System Piping",

a Virginia Electric and Power Company herewith forwards the results of the required inspections recently completed on North Anna Power Station Unit 1.

If you have any questions or require additional information, please contact this office.

Very truly yours,

- s

- /'.jY({nr.

C. M. Stallings Vice President-Power Supply and Production Operations Attachment cc: Director, Office Inspection and Enforcement Division of Reactors Operations Inspection U. S. Nuclear Regulatory Commission Washington, D. C. 20555 1665 257 8001 020 // 3 k

Virginia Electric and Power Company North Anna Power Station, Unit #1 Attachment Docket No. 50-338 Results of Examinations Required by IE Bulletin 79-13 " Cracking in Feedwater System Piping" On November 4,1979, during the first refueling outage for Unit 1, the examina-tions required by IE Bulletin 79-13 were completed. The examinations, which were performed in accordance with Vepco NDT procedures, found no indications of any cracking problems in the feedwater nozzles or piping weld areas.

The examinations performed included the following:

It Radiography of:

a. Three feedwater nozzle to pipe welds,
b. All feedwater piping welds in containment.
c. An area of 16 inches downstream of the auxiliary feedwater to main feedwater connection on all three loops.

i 2. Ultrasonics of:

a. Base material on main feedwater piping around the area of the auxiliary feedwater connections on all three loops.
3. Magnetic particle of:
a. Auxiliary feedwater to main feedwater connections on all three loops.
4. Visual Inspection of:
a. All welded supports on rain feedwater piping inside containment.

_ 1665