Forwards IE Insp Rept 50-341/79-22 on 791023-24.No Noncompliance Noted
ML19257A099
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 11/15/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hines E
DETROIT EDISON CO.
Shared Package
ML19257A100 List:
References
NUDOCS 8001020098
Download: ML19257A099 (2)


See also: IR 05000341/1979022

Text

/ma areg}o

,

UNITED STATES

,

$ .lj 3

!

'%

NUCLEAR REGULATORY COMMISSION

,

/ $

REGION 111

"'

o,

[

799 ROOSEVELT ROAD

  • ..../

'%v

GLEN ELLYN, ILLINOIS 60137

r ,n

a

Docket No. 50-341

The Detroit Edison Company

ATTN:

Mr. Edward Hines, Assistant

Vice President and Manager

Quality Assurance

2000 Second Avenue

Detroit, MI 48226

Gentlemen:

This refers to the inspection conducted by Messrs. F. J. Jablonski and

H. S. Phillips of this office on October 23 and 24, 1979, of activities

at Enrico Fermi Nuclear Station, Unit 2, authorized by NRC Construction

Permit No. CPPR-87 and to the discussion of our findings with others of

your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and inter-

views with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room, except as

follows.

If this report contains information that you or your contractors

believe to be proprietary, you must apply in writing to this office, within

twenty days of your receipt of this letter, to withhold such information from

public disclosure. The application must include a full statement of the

reasons for which the information is considered proprietary, and should be

prepared so that proprietary information identified in the application is

contained in an enclosure to the application.

1665 228

Ok

8oo1020

.

uu. i 5 1919

The Detroit Edison

-2-

.

Company

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

'

/

h hx<2d k'u

Gaston Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection

Report No. 50-341/79-22

cc w/ encl:

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Ronald Callen, Michigan Public

Service Commission

Eugene B. Thomas, Jr., Attorney

1665