ML19257A084
| ML19257A084 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 11/06/1979 |
| From: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Aswell D LOUISIANA POWER & LIGHT CO. |
| Shared Package | |
| ML19257A085 | List: |
| References | |
| NUDOCS 8001020074 | |
| Download: ML19257A084 (2) | |
See also: IR 05000382/1979014
Text
7Ec
-
UNITE D STATES
[ma How%,
NUCLEAR REGULATORY COMMISSION
8'
- / #
REGloN IV
V M*kl~ / -]E
I
I
- '
o
611 RYAN PLAZA DRIVE, SUITE 1000
%[
ARLINGTON, TEXAS 76012
%
November 6, 1979
,
In Reply Refer To:
RIV
Docket No. 50-382/R,
79-14
.
Louisiana Power and Light Company
ATTN:
Mr. D. L. Aswell
Vice President - Power Production
142 Delaronde Street
New Orleans, Louisiana
70174
Gentlemen:
This refers to the investigation conducted by Mr. R. K. Herr and other
members of our staff during the period September 24-25, 1979, of activ-
ities authorized by NRC Construction Permit No. CPPR-103 for Waterford
Steam Electric Station, Unit 3, concerning allegations expressed by a
former Quality Control inspector employed by one of your subcontractors.
The investigation and our findings are discussed in the enclosed
investigation report.
Within the scope of the investigation, no items of noncompliance were
identified.
During the investigation an additional allegation regarding inspection
activities of an Authorized Nuclear Inspector (ANI) was received.
This
allegation was substantiated by our investigation.
Please inform us of
the results of your investigation of this matter, and corrective action
taken,since this may have an impact on our future inspections of your
Quality Assurance Records.
In accordance with Cection 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter
and the enclosed investigation report will be placed in the hTC's
Public Document Room.
If the report contains any information that
you believe to be proprietary, it is necessary that you submit a
1665
179
04y
gs oo1oco
.
Louisiana Power and Light Company
-2-
November 6, 1979
written application to this office, within 20 days of the date of
this letter, requesting that such information be withheld from
public disclosure. The application must include a full statement of
the reasons why it is claimed that the information is proprietary.
The application should be prepared so that any proprietary information
identified is contained in an enclosure to the application, since the
application without the enclosure will also be placed in the Public
Document Room.
If we do not hear from you in this regard within the
specified period, the report will be placed in the Public Document
Room.
Should you have any questions concerning this investigation, we will be
pleased to discuss them with you.
Sincerely,
Cc-
W. C. Seid e ,, Chief
Reactor Con
uction and
Engineering Support Branch
Enclosure:
IE Investigation Report No. 50-382/79-14
1665
171