ML19256F339

From kanterella
Jump to navigation Jump to search
Forwards LER 79-096/03L-0
Date released: 09/27/2019 Download: ML19256F339


LER 79-096/03L-0:on 791115,during Reactor Low Pressure Channel Calibr & Function Test,Switches 1 & 2 of 2-B21-PS-N021D Were Out of Tolerance.Caused by Loose Actuating Cam.Cam Set Screw Tightened & Instrument Calibr
ML19256F342
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 12/07/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19256F342 (1)
Forwards LER 79-096/03L-0
ML19256F338
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 12/07/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19256F338 (1)