1
--
.
- o
UNITED STATES
g
!
NUCLEAR REGULATORY COMMISSION
n
e
REGION il
o
101 MARIETTA ST N.W SUITE 310o
AT'. J.TA. GEORGIA 3o3o3
.....g
OCT 151979
In Reply Refer To:
RII: PAT
50-335/79-23
Florida Power and Light Company
Atta:
R. E. Uhrig, Vice President
Advanced Systems and Technology
Post Office Box 529100
tiiami, Florida 33152
Gentlemen:
This refers to the inspection conducted by P. A. Taylor of this office on
.
September 10-14, 1979 of activities authorized by NRC License No. DPR-67 for the
St. Lucie facility, and to the discussion of our findings held with C. Wethy at
the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. This item and references
to pertinent requirements are listed in the Notice of Violation enclosed here-
with as Appendix A.
This notice is sent to you pursuant to the provisions of
Section 2.201 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal
Regulations. Section 2.201 requires you to submit to this office, within 20
days of your receipt of this notice, a written statement or explanation in reply
including:
(1) corrective steps which have been taken by you, and the results
achieved; (2) corrective steps which will be taken to avoid further noncompliance;
and (3) the date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in t'te NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
1653
209
...
.
7912180
-
355
.
.
.
.'
OCT _51979
~
Florida Power and Light Company
-2-
,
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
'
/
a-
. T. Sutherland, Chief
Fuel Facility and Materials
Safety Branch
.
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-335/79-23
cc w/ enclosures:
C. M. Wethy, Plant Manager
Post Office Box 128
Ft. Pierce, Florida 33450
Nat Weems, Assistant QA Manager
Post Office Box 128
Ft. Pierce, Florida 33450
1653
210
. .
'
'
OCT 151979
-
APPENDIX A
Florida Power and Light Company
License No. DPR-67
Based on the NRC inspection September 10-14, 1979, certain of your activities
were apparently not conducted in full compliance with NRC requirements as indi-
cated below. These items have been categorized as described in correspondence
to you dated December 31, 1974.
As required by Technical Specification 6.8.1, written procedures shall
be established, implemented and maintained. Procedure H.P.90, Sections 4.4
and 7.1, require all emergency equipment to be checked and inventoried once
every month at selected locations and to use the appropriate inventory list
to ensure that proper supplies are present.
Contrary to the above, a review of the site assembly station inventory
records on September 12, 1979, indicated that the inventory of emergency
items listed on inventory record sheet 2 of 2 (which contains 20 separate
items for emergency use) was not performed for the months df January,
February and May 1979.
This is a deficiency.
.
1653