1

--

.

  1. o

UNITED STATES

g

!

NUCLEAR REGULATORY COMMISSION

n

e

REGION il

o

101 MARIETTA ST N.W SUITE 310o

AT'. J.TA. GEORGIA 3o3o3

.....g

OCT 151979

In Reply Refer To:

RII: PAT

50-335/79-23

Florida Power and Light Company

Atta:

R. E. Uhrig, Vice President

Advanced Systems and Technology

Post Office Box 529100

tiiami, Florida 33152

Gentlemen:

This refers to the inspection conducted by P. A. Taylor of this office on

.

September 10-14, 1979 of activities authorized by NRC License No. DPR-67 for the

St. Lucie facility, and to the discussion of our findings held with C. Wethy at

the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed here-

with as Appendix A.

This notice is sent to you pursuant to the provisions of

Section 2.201 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal

Regulations. Section 2.201 requires you to submit to this office, within 20

days of your receipt of this notice, a written statement or explanation in reply

including:

(1) corrective steps which have been taken by you, and the results

achieved; (2) corrective steps which will be taken to avoid further noncompliance;

and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in t'te NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

1653

209

...

.

7912180

-

355

.

.

.

.'

OCT _51979

~

Florida Power and Light Company

-2-

,

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

'

/

a-

. T. Sutherland, Chief

Fuel Facility and Materials

Safety Branch

.

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-335/79-23

cc w/ enclosures:

C. M. Wethy, Plant Manager

Post Office Box 128

Ft. Pierce, Florida 33450

Nat Weems, Assistant QA Manager

Post Office Box 128

Ft. Pierce, Florida 33450

1653

210

. .

'

'

OCT 151979

-

APPENDIX A

NOTICE OF VIOLATION

Florida Power and Light Company

License No. DPR-67

Based on the NRC inspection September 10-14, 1979, certain of your activities

were apparently not conducted in full compliance with NRC requirements as indi-

cated below. These items have been categorized as described in correspondence

to you dated December 31, 1974.

As required by Technical Specification 6.8.1, written procedures shall

be established, implemented and maintained. Procedure H.P.90, Sections 4.4

and 7.1, require all emergency equipment to be checked and inventoried once

every month at selected locations and to use the appropriate inventory list

to ensure that proper supplies are present.

Contrary to the above, a review of the site assembly station inventory

records on September 12, 1979, indicated that the inventory of emergency

items listed on inventory record sheet 2 of 2 (which contains 20 separate

items for emergency use) was not performed for the months df January,

February and May 1979.

This is a deficiency.

.

1653

211

,co W