IE Insp Rept 50-412/79-06 on 790827-30.No Noncompliance Noted.Major Areas Inspected:Asme Certification Sys,Qc Program for safety-related Steel Structure Erection,Response to Bulletins,Circulars & Outstanding Items
ML19256F079
Person / Time
Site: Beaver Valley
Issue date: 09/26/1979
From: Narrow L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19256F075 List:
References
50-412-79-06, 50-412-79-6, NUDOCS 7911210307
Download: ML19256F079 (8)


See also: IR 05000412/1979006

Text

%

U.S. NUCLEAR REGULATORY COMMISSION

OFFICE OF INSPECTION AND ENFORCEMENT

Region I

Report No. 50-412/79-06

Docket No. 50-412

License No. CPPR-105

Priority

--

Category

A

Licensee:

Duquesne Licht Comoany

435 Sixth Avenue

Pittsburah, Pennsylvania

15219

Facility Name: Beaver Valley Power Station. Unit 2

Inspection at: Pittsburgh and Shippingport, Pennsylvania

Inspection cond ted:

u st 27-30, 1979

Gt/b4/

7

Inspectors:

f,u ,

/ date signed

L. Narrow, Reactor Inspector

date signed

date sicned

f/16 78

Approved by:

N,M //l4

tf/

u

a

sfgned

'

R. W. McGaughy, Mik Projects Section,

RC&ES Branch

Inscection Summary:

Inspection on August 27-30, 1979 (Recort No. 50-412/79-06)

Areas Inspected:

Routine,

announced inspection by a regional based inspector

-

to7eview compliance with the ASME certification system; compliance with 10 CFR 21; the QC program for erection of safety related steel structures; and, the

status of Bulletins, Circulars and other outstanding items.

The inspection

involved 8 inspector-hours in the licensee's office and 18 inspector-hours on

site by one NRC regional based inspector.

Results:

No items of noncompliance were identified.

1380

)94

Region I Form 12

(Rev. April 77)

7911210 3 0]

.

.

D_E_ TAILS

E

1.

Persons Contacted

Duquesne Light Company (DLC)

  • H. N. Crooks, Supervisor, Adminie'rative Services
  • R. Coupland, Director of Qual cy Control
  • D. W. Denning, Assistant Director of Quality Control

E. J. Huesmann, Administrative Coordinator (Pittsburgh)

  • E. F. Kurtz, Senior QA Engineer

D. Rohm, Quality Control Engineer

  • W. H. Sikorski, Quality Assurance Supervisor

E. Staples, QC Engineer

  • R. J. Swiderski, Superintendent of Construction

H. Van Wassen, Project Manager (Pittsburgh)

  • R. Washabaugh, Manager, Quality Assurance Department

R. L. Williamson, Quality Control Inspector

Stone and Webster (S&W)

S. T. Adams, Superintendent of Construction Services

  • C. R. Bishop, Superintendent of Construction

P. N. Bodine, Supervisor of Document Systems

S. M. Dew, Head of SE0

A. C. McIntyre, Site Engineering Office

V. W. Pardo, Resident Engineer

C. R. Paul, Purchasing Agent

R. J. Wood, ASME Program Administrator

Schneider, Incorporated

J. Zielinski, Field Engineer

The inspectcr also interviewed other licensee and contractor personnel

during the ir e,pection.

  • denotes those present at the exit interview.

2.

Plant Tour

The inspector observed work activities in progress, completed work, and

construction status in several areas.

Work items were examined for obvious

defects and for noncompliance with regulatory requirements and licensee

conmitments. Specific activities observed by the inspector included rein-

1380

195

.

.

3

forcing steel installation for the primary shield wall, weld rod storage

issue and control at Schneider, Incorporated Distribution Center No. 4 in

the auxiliary building, and installation of service water lines 258 and

259.

No items of noncompliance were identified.

3.

Compliance witi.10 CFR 21

The inspector examined DLC and S&W procedures for compliance with the

requirements of 10 CFR 21 and audited implementation of these procedures.

The following procedures were examined:

DLC Quality Assurance Memorandum DLC QA-2150, dated December 16, 1977,

-

" Requirements of 10 CFR 21."

DLC Engineering Management Procedure EMP8.1, Revision 3, dated February

-

14,1979, " Report of Sign'ficant Deficiencies and Deviations - De-

sign / Construction Phase."

S&W Construction Management Manual CMM No. 410, Revision 0, dated June

-

29, 1979, " Reporting of Significant Problems."

S&W Field Purchasing Manual Section V, " Purchase Orders and Memos of

-

Charge," Attachment V.H.

The inspector discussed implementation of these procedures with representa-

tives of the licensee and S&W, particularly with respect to inclusion of

these requirements in site purchase orders, evaluation of deviations,

notification of a Director / Responsible Officer (D/R0) and notification to

NRC.

The inspector observed that the required documents had been posted in

several locations at the DLC office in Pittsburgh, at the DLC QA/QC offices

at the site, and at the S&W offices at the site.

The inspector noted that DLC QA-2150 and EMP 8.1 establish procedures which

appear to be inconsistent with the requirements of 10 CFR 21 in two respects.

a.

Both of these documents provide for evaluation of deficiencies and for

submittal of a written report of a reportable deviation within 30 days

after initial NRC notification.

This does not meet the 10 CFR 21

requirement (21.21(b)(2)) that a written report be submitted within 5

days after the information is obtained.

b.

These documents also do not require that the D/R0 be notified of a

reportable deviation until submittal of the written report which may

1380 196

.

-

4

be as much as 30 days after the information is obtained.

This does

not appear to be consistent with 10 CFR 21. Although 21.21(b)(4) does

state that the D/R0 may authorize an individual to provide the required

notification, 21.21(a) requires that the D/R0 be informed of the

deviation.

In addition, the delay in informing the D/R0 would appear

to affect imposition of a penalty since 21.61 states that the D/R0 is

subject to a civil penalty if he "--knowingly and consciously fails to

provide such notice- ."

This item is unresolved pending clarification of the above inconsistencies

(.412/79-06-01).

4.

Compliance with ASME Certification Requirements

The inspector identified the effective dates of ASME codes applicable to

this project and audited the responsibilities and activities of the certi-

ficate holders.

Authorizations in effect on site included:

Certificate No. N-2026 to DLC. Authorization to complete Form N-3 for

-

Beaver Valley Power Station, Unit 2; effective dated March 8,1978 to

March 8, 1981.

Certificate No. N-1513-2 to S&W.

Authorization to use "N" symbol for

-

construction of Beaver Valley Unit 2 for which fabrication and instal-

lation is subcontracted to certificate holders; effective dated June

18, 1979 to June 18, 1982.

Certificate No. 1824-1 to Schneider, Incorporated.

At thorization to

-

use "NA" symbol for field installation of components, appurtenances,

piping subassemblies, and component supports at Beaver Valley Unit 2;

effective dated August 12, 1977 to August 12, 1980.

Certificate No. 1825-1 to Schneider, Incorporated.

Authorization to

-

use "NPT" symbol for field fabrication of component supports and

piping subassemblies at Beaver Valley Unit 2; effective dated August

12, 1977 to August 12, 1980.

Certificate No. N-1472-7 to Richmond Engineering Company, Incorporated.

-

Authorization to use "N" symbol for field construction of Class 3

vessels and tanks at Beaver Valley Unit 2; effective dates October 4,

1978 to October 4,1981.

Richmond Engineering Company was not working

on site at this time, but had installed some tanks on site and would

return for construction of some additional tanks.

1380 197

.

.

5

.

The inspector was informed that Pittsburgh-Des Moines Steel Company would

be performing ASME III work on site in the future but had not been surveyed

for authorization as yet.

No items of noncompliance were identified.

5.

pocumentation - Boric Acid Tank No. 2CHS-TK-21B

The inspector audited documentation listed below concerning Tank No. 2CHS-

TK-218 for conformance to the requirements of the PSAR and S&W Specification

2BVS-33, " Specification fo* Field Fabricated Tanks."

Form N-1, " Manufacturers Data Report for Nuclear Vessels."

-

A random selection of Material Test Reports.

-

Cleaning Certification.

-

Radiographic Interpretat an Reports.

-

Certification of Delta Ferrite Examination.

-

Certification of PT Examination.

-

Certification of Vacuum Box and Hydrostatic Tests.

-

QC and NDE Qualification Records.

-

Field Erection Operational Work Sheet.

-

The inspector also examined N&D No. 0766 for deficiencies in analysis of

water for test purposes. This was resolved on the basis of retest of a

water sample and engineering review of identified deficiencies.

No items of noncompliance were identified.

6.

Licensee Action on NRC Bulletins and Circulars

The inspector reviewed records concerning the licensee's action on NRC

issued Bulletins and Circulars and discussed these actions and records with

licensee personnel responsible for processing Bulletins and Circulars.

The following Bulleons were closed based on information from S&W and the

NSSS that the equipment in question had not been used and would not be used

in this plant:

1380

198

.

6

Bulletin No.

Subject

78-06

Defective Cutler-Hamer, Type M Relays with DC Coils

78-10

Bergen-Paterson Hydraulic Shock Suppressor Accumulator

Spring Coils

79-03

Longitudinal Weld Defects in ASME SA-312 Type 304

Stainless Steel Pipe Spools Manufactured by Youngstown

Welding and Engineering Company

79-04

Incorrect Weights for Swing Check Valves Manufactured

by Velan Engineering Corporation

79-11

Faculity Overcurrent Trip Device in Circuit Breakers

for Engineered Safety Systems

The following Circulars a e closed because they either do not apply or

because records show that corrective action hss been taken to prevent

conditions described in Circular.

Circular No.

Description

76-03

Radiation Exposure in Reactor Cavities

77-01

Malfunctions of Limitorque Valve Operators77-02A

Potential Heavy Spring Flooding

77-03

Fire Inside a Motor Control Center

77-05

Liquid Entrapment in Valve Bonnets

77-06

Effects of Hydraulic Fluid on Electrical Cable

77-13

Reactor Safety Signals Negated During Testing

77-15

Degradation of Fuel 0.1 Flow to the Emergency Diesel

Generator

78-02

Proper Lubricating Oil for Terry Turbines

78-03

Packaging Greater Than Type A Ouantities of Low

Specific Activity Radioactive Material for Transport

1380 199

,

.

7

78-04

Installation Errors That Could Prevent Closing of

Fire Doors

78-05

Inadvertent Safety Injection During Cooldown

78-06

Potential Common Mode Flooding of ECCS Equipment

Rooms at BWR Facilities

78-09

Arcing of General Electric Company NEMA Size 2 Con-

tractors

78-13

Inoperability of Multiple Service Water Pumps

78-15

Tilting Disk Check Valves Fail to Close with Gravity

in Vertical Position

78-16

Limitorque Valve Actuators

78-19

Manual Override (Bypass) of Safety Systems Actuation

Signals

79-04

Loose Locking Nut on Limitorque Valve Operators

79-11

Design / Construction Interface Problem

79-12

Potential Diesel Generator Turbocharger Problem

The following Circulars remain unresolved for the reasons shown:

Circular No. 77-11, Leakage of Containment Isolation Valves with

-

Resilient Seats, pending determination whether valve types identified

in vendor letter are on site and if so whether storage recommendations

are being followed (50-412/77-Cl-ll).

Circular ;1o. 79-02, Failure of 120 Volt Vital AC Power Supplies,

-

pending response from Station Superintendent (50-412/79-C1-02).

7.

Problems Identified at Other Sites

The inspector informed the licensee representatives of problems which had

teen identified at other sites with the following equipment:

Tanks Fabricated by Industrial Piping Supply Company

-

Power Operated Relief Valves by Control Components, Incorporated

-

1380

100

.

.

8

The inspector was informed that review by the licensee and S&W showed that

equipment of the type described had not been obtained from these companies

and that the companies were not on their approved bidders list.

The inspector had no further questions concerning this item.

8.

Licensee Action on Previous Inspection Findings

(0 pen) Unresolved Item (78-01-01):

Licensee action on Circulars.

The

inspector examined " Project Team Internal Instruction," PTG-4, dated November

16, 1978, which provides for distribution of Bulletins and Circulars and

action assignment by the Project Manager.

The inspector also discussed

control and followup methods with the licensee representative and examined

the log which was maintained and which included the Bulletins and Circulars.

The inspector had no further questions concerning control of Circulars.

However, this item remains open pending completion of action on Circulars

77-01 and 77-14.

(Closed) Unresolved Item (78-BC-01):

1/2-inch Nelson Studs from Acme Steel

Company.

Site QC has been informed by procurement that Acme Steel Company

is not a supplier and no Acme Steel Company material had been suppliea on

the site.

9.

Exit Interview

The inspector met with licensee and contractor representatives (denoted in

Paragraph 1) at the conclusion of the inspection on August 30, 1979.

The

inspector summarized the scope and findings of the inspection as described

in this report.