Forwards IE Insp Repts 50-245/79-18 & 50-336/79-19 on 790701-0803.No Noncompliance Noted
ML19256F077
Person / Time
Site: Millstone  
Issue date: 10/01/1979
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML19256F078 List:
References
NUDOCS 7911210305
Download: ML19256F077 (2)


See also: IR 05000245/1979018

Text

YN

7

9

UNITED STATES

p ago

jo

NUCLEAR REGULATORY COMMisslON

y

{o

REGION I

$

f,$

431 PARK AVENUE

,

f

KING OT PRUS$1A. PENNSYLVANIA 19408

\\,

/

.....

Docket Nos. 50-245

OCT 0 1 1979

50-336

Northeast Nuclear Energy Company

ATTN:

Mr. W. G. Counsil

Vice President - Nuclear

Engineering and Operations

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject:

Combined Inspection 50-245/79-18 and 50-336/79-19

This refers to the inspection conducted by Mr. J. Shedlosky of this office on

July 1 through August 3,1979 at the Millstone Nuclear Power Station, Waterford,

Connecticut, of activities authorized by NRC License Nos. DPR-21 and DPR-65 and

to the discussions of our findings held by Mr. Shedlosky with Mr. Opeka and

other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, measurements made by the

inspector, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room.

If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure.

Any such application must be

accompanied by an affidavit executed by the owner of the information, which

identifies the document or part sought to be withheld, and which contains a

statement of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (.b)(4) of Section 2.790.

The information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from ycu in this

regard within the specified period, the report will be placed in the Public

Document Room.

1380

103

79nsto3Of

.

.

01 mg

Northeast Nuclear Energy Company

2

No reply to this letter is required; however, if you should have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

- _

'n

El

n ' . Brunner, Chief

Re ctor Operations and Nuclear

S pport Branch

Enclosure:

Office of Inspection and Enforcement Combined

Inspection Report Number 50-245/79-18 and 50-336/79-19

cc w/ encl:

J. F. Opeka, Station Superintendent

D. G. Diedrick, Manage- of Quality Assurance

J. R. Himmelwright, Licensing Safeguards Engineer