ML19256E944
| ML19256E944 | |
| Person / Time | |
|---|---|
| Issue date: | 11/01/1979 |
| From: | Miller H NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Nasmith H THURBER CONSULTANTS, LTD. |
| Shared Package | |
| ML19256E939 | List: |
| References | |
| RTR-REGGD-03.XXX, RTR-REGGD-3.XXX NUDOCS 7911160024 | |
| Download: ML19256E944 (1) | |
Text
. ~ ~.,
.a V m M 81IG Qg) gff UNITED STATES
//g NUCLEAR REGULATORY COMMISSION
{j
- .py) m g
g/
WASHINGTON, D. C. 20555 sg
- v/ l nlOV ';1 l97-Professor H. W. Nasmith Principal Thurber Consultants LTD 1623 ficKenzie Avenue Victoria B.C. V8N 1 AS
Dear Professor Nasmith:
In response to your request for information on the phrase "long term" as defined by NRC, I have enclosed a copy of the draft Generic Environmental Impact Statement (GEIS) on Uranium Milling, Volume 1.
The phrase "long term" is difficult to define. However, with respect to uranium milling, the phrase is generally used to mean the time following the end of milling operations and continuing for an indefinite period.
This phrase has been used with application to the monitoring requirements of a decomissioned mill site, as described in the GEI.S.. For more details, I direct your attention to Figure 14.1 and sections 14.i and 14.3 of the GEIS.
I hope this is responsive to your question.
If you have any additional questions, please do not hesitate to contact me again.
Since rely,,
I J. Miller Uranium Recovery Licensing Branch Division of Waste 'ianagement
Enclosure:
As stateo 1341 256 y
7911160 0 1