Responds to NRC 781208 Ltr Re Violations Noted in IE Insp Repts 50-445/78-18 & 50-446/78-18.Corrective Actions:Welding Engineer Work Reviewed & Surveillance of Welder Performed
ML19256E742
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/01/1979
From: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19256E740 List:
References
NUDOCS 7911150120
Download: ML19256E742 (2)


Text

. . . - . _

r .

9 TEXAS UTILITIES GENERXrING COMInNY 200& lutY sN TO% Ett . DALLAH,TEXAH 75201 R. J. GA RY

. . .y. 3, . . 3 3 7 TXX-3050 Mr. W. C. Seidle, Chief Reactor Construction and Engineering Support Branch U. S. Nuclear Regulatory Commission Office of Inspection & Enforcement 611 Ryan Plaza Dr., Suite 1000 Docket Nos. 50-445/Rpt. 78-18 Arlington, Texas 76012 50-446/Rpt. 78-18 b

COMANCHE PEAK STEAM ELECTRIC STATION 1981-83 2300 MW INSTALLATION SUPPLEMENTAL RESPONSE TO NRC INSPECTION REPORT NO. 78-18 DOCKET NOS. 50-445 and 50-446 FILE NO. 10130

Dear Mr. Seidle:

This is to advise you of our intention to modify our approach to surveillance of welding operations as previously described to you in our Letter No.

TXX-2927 dated December 20, 1978. This modification is based on our evalu-ation of the benefits of the program outlined to you in the subject letter, significant improvements in the CPSES welding program, and formal controls that have been established by the contractor through the site Welding Engineering Department.

Prior to November 1, 1979 and following revision of established procedures and development of a new procedure, we plan to implement the following program:

1) Weldiag Engineering will continue to monitor all welders involved in permanent plant construction on a fou" teen day cycle as currently established in Procedure WEI-3, Rev.0.

The existing nonconformance system will be implemented.

2) Results of the Welding Engineering efforts will be routinely reviewed by the Site Quality Engineering Group, to verify that CPSES QA Program Requirements for Corrective Action are implemented in a timely manner.

1333 114 7oi1150 /JEC7*-

. ._ - . - , . . . . . - . ~ . . . . . . . . - . . . . . . . . . . - . . .. ..

Y Inspection Report No. 78-18 TXX-3050 Page 2

3) QA Staff personnel will perform an independent surveillance of welders working on safety-related insto?lations using a random sampling program. Results of this ,>rogram will be used to make adjustments, as required, to the Welding Engineer-ing Program.

If you have any questions concerning this supplemental response, please advise.

Very truly yours, R. . Gary RJG:df 1333 119

.