UNITED STATES
'S Y
-
NUCLEAR REGULATORY COMMISSION
-
o
$
$
REGION il
%*****g[
o,
101 MARIETTA sT
N.W., SUITE 3100
ATLANTA, GEORGIA 3o303
In Reply Refer To:
OCT 0 51979
RII:RCS
50-327/79-50
Tennessee Valley Authority
ATTN:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
-
Chattanooga, TN 37401
Gentlemen:
This refers to the inspection conducted by R. C. Sauer of this office on
September 19-21, 1979, of activities authorized by NRC Construction Permit
No. CPPR-72 for the Sequoyah facility, and to the discussion of our findings
held with J. Ballentine at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
We have examined actions you have taken with regard to previously reported
unresolved item . The status of these items is discussed in the enclosed
report.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this , letter, we will be glad to discuss
them with you.
p.
,
Sincerely,
1333
103
,
-
f. c .
R. C.
ewis, Acting Chief
Reactor Operations and Nuclear
Support Branch
.
.
7911150 /03
i
9
g
-
.-
\\
Tennessee Valley Authority
-2-
OCT 0 51979
.
Enclosure:
Inspection Report No. 50-327/79-50
.
cc w/ encl:
G. G. Stack, Project Manager
P. O. Box 2000
Daisy, TN 37319
J. M. Ballentine
Plant Superintendent
P. O. Box 2000
Daisy, TN 37319
J. F. Cox
400 Commerce Street
W10C131 C
Knoxville, TN 37902
D. L. Lambert, Project Engineer
400 Chestnut Street Tower II
Chattanooga, TN 37401