Forwards IE Insp Rept 50-327/79-50 on 790919-21.No Noncompliance Noted
ML19256E733
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 10/05/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19256E734 List:
References
NUDOCS 7911150103
Download: ML19256E733 (2)


See also: IR 05000327/1979050

Text

fl0

'

MO

8

o,,

UNITED STATES

'S Y

-

NUCLEAR REGULATORY COMMISSION

-

o

$

$

REGION il

%*****g[

o,

101 MARIETTA sT

N.W., SUITE 3100

ATLANTA, GEORGIA 3o303

In Reply Refer To:

OCT 0 51979

RII:RCS

50-327/79-50

Tennessee Valley Authority

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

-

Chattanooga, TN 37401

Gentlemen:

This refers to the inspection conducted by R. C. Sauer of this office on

September 19-21, 1979, of activities authorized by NRC Construction Permit

No. CPPR-72 for the Sequoyah facility, and to the discussion of our findings

held with J. Ballentine at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously reported

unresolved item . The status of these items is discussed in the enclosed

report.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this , letter, we will be glad to discuss

them with you.

p.

,

Sincerely,

1333

103

,

-

f. c .

R. C.

ewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

.

.

7911150 /03

i

9

g

-

.-

\\

Tennessee Valley Authority

-2-

OCT 0 51979

.

Enclosure:

Inspection Report No. 50-327/79-50

.

cc w/ encl:

G. G. Stack, Project Manager

P. O. Box 2000

Daisy, TN 37319

J. M. Ballentine

Plant Superintendent

P. O. Box 2000

Daisy, TN 37319

J. F. Cox

400 Commerce Street

W10C131 C

Knoxville, TN 37902

D. L. Lambert, Project Engineer

400 Chestnut Street Tower II

Chattanooga, TN 37401

1333

104

.

4

.

9