7A y
UNITED STATES o
y y)-f,( ( gg NUCLEAR REGULATORY COMMISSIOfJ
'T,
([\\['
[
631 PARK AVENUE
./E REGION I 0, -
%, ' Nd
,o KING OF PRUSSIA, PENNSYLVANIA 1940G
+....
Docket Nos. 50-322 50-516 DCI 2 9 gy) 50-517 Long Island Lighting Company ATTN:
Mr. Andrew W. Wofferd Vice President 175 East Old Country Road Hicksville, New York 11801 Gentlemen:
The enclosed IE Bulletin 79-17, Revision 1, is forwarded to you for information.
No written response is required.
If you desire additional information regarding this matter, please contact this office.
Sincerely,
~
oyce H. Grier
- Director
Enclosures:
1.
IE Bulletin No. 79-17, Revision 1 w/ Attachment 2.
List of IE Bulletins Issued in the Last Six Months CONTACT:
L. E. Tripp 215-337-5282 cc w/ enc 1s:
J. P. Novarro, Project Manager Edward M. Barrett, Esquire Edward J. Walsh, Esquire T. F. Gerecke, Manager, Engineering QA Department 1336
$33 791115004-2.
ENCLOSURE 1 UNITED STATES SSINS No.:
6820 NUCLEAR REGULATORY COMMISSION Accession No.:
OFFICE OF INSPECTION AND ENFORCEMENT 7908220157 1 3 7 WASHINGTON, D.C.
20555 IE Bulletin No. 79-17 Revision 1 Date:
October 29, 1979 Page 1 of 5 PIPE CRACKS IN STAGNANT 80 RATED WATER SYSTEMS AT PWR PLANTS Description of Circumstances:
IE Bulletin Ho. 79-17, issued July 26, 1979, provided information on the R1 cracking experienced to date ir safety-related stainless steel piping R1 systems at PWR plants.
Certain actions were required of all PWR R1 facilities with an operating license within a specified 90-day time R1 frame.
After several discussions with licensee owner group representatives and R1 inspection agencies it has been determined that the requirements of Item 2, R1 particularly the ultrasonic examination, may be impractical because of un-R1 availability of qualified personnel in ceriain cases to complete the in-R1 spections within the time specified by the Bulletin. To alleviate this R1 situation and allow licensees the resources of improved ultrasonic inspec-R1 tion capabilities, a time extension and clarifications to the bulletin have R1 been made.
These are referenced to the affected items of the original R1 bulletin.
During the period of November 1974 to February 1977 a number of cracking incidents have been experienced in safety related stainless steel piping systems and por-tions of systems which contain oxygenated, stagnant or essentially stagnant bor-ated water.
Metallurgical investigations revealed these cracks occurred in the weld heat affected zone of 8-inch to 10-inch type 304 material (schedule 10 and 40), initiating on the niping I.D. surface and propagating ii) either an inter-granular or transgranular mode typical of Stress Corrosion Cracking.
Analysis indicated the probable corrodents to be chloride and oxygen contamination in the affected systems.
Plants affected up to this time were Arkansas Nuclear Unit 1, R. E. Ginna, H. B. Robinson Unit 2, Crystal River Unit 3, San Onofre Unit 1, and Surry Units 1 and 2.
The NRC issued Circular No. 76-06 (copy attached) in view of the apparent generic nature of the problem.
During the refueling outage of Three Mi of this year, visual inspections disclo in tiie spent fuel cooling system piping DUPLICATE DOCUMENT removal system.
These cracks were foun and later confirmed by liquid penetrant cracking was reported to the NRC in a L Entite document previously 1979.
A preliminary metallurgical anal entered into system under:
y section of cracked and leaking weld joi
/,,
ANO 4
No. of pages:
R1 - Identifies those and revi