'o ATLA... A, GEORGIA 30303 OCT 171979 In Reply Refer To:
.RII:JPO Duke Power Company Attn:
W. O. Parker, Jr.
Vice President, Steam Production P. O. Box 2178 Charlotte, North Carolina 28242 Gentlemen:
The enclosed Bulletin No. 79-13, Revision 2 is forwarded to you for infor-mation. No written response is required.
If you desire additional information regarding this matter, lease contact this office.
Sincerely,
\\
m$CW ames P. O'Reilly
' rector
Enclosures:
1.
lE Bulletin No. 79-13, Rev on 2.
Listing of IE Bulletins Issued in Last Six Months
"2 351 7911070
GCT 171979 Duke Power Company,
cc w/ encl:
M. D. McIntosh, Plant Mansger Post Office Box 488 Cornelius, North Carolina 28031 J. C. Rogers, Project Manager Post Office Box 33189 Charlotte, North Carolina 28242 1 " 2 352
SSINS:
6830 Accession No.:
7908220135 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 October 16, 1979 IE Bulletin No. 79-13 Revision 2 CRACKING IN FEEDWATER SYSTEM PIPING De ription of Circumstances:
This revision to IE Bulletin No. 79-13 is based on the results of the radio-graphic examinations and ongoing investigation of the subject problem to date 4
since the initial Bulletin was issued. The revision reduces in scope the R2 number and extent of the piping system welds required to be examined. The requirements for reporting and action time frame remain unchanged.
On May 20, 1979, Indiana and Michigan Power Company notified.he NRC of cracking in two feedwater lines at their D. C. Cook Unit 2 facility.
The cracking was discovered following a shutdown on May 19 to investigate leakage inside containment. Leaking circumferential cracks were identified in the 16-inch feedwater elbows adjacent to two steam generator nozzle elbow welds.
Subsequent radiographic examination revealed crack indications in all eight steam generator feedwater lines at this location on both Units 1 and 2.
On May 25, 1979, a letter was sent to all PWR licensees by the Office of Nuclear Reactor Regulation which informed licensees of the D. C. Cook failures and requested specific information on feedwater system design, fabrication, inspection and operating histories. To further explore the generic nature of the cracking problem, the Office of Inspection and Enforcement requested licensees of PWR plants in current outages to immediately conduct volumetric examination of certain feedwater piping welds.
As a result of these actions, several other licensees with Westinghouse steam generators reported crack indications. Southern California Edison reported on June 5,1979, that radiographic examination revealed indications of cracking in feedwater nozzle-to pipe welds on two of three steam generators of San Onofre Unit 1.
On June 15, 1979, Carolina Power and Light reported that radiography showed crack indications in similar locations at their H. B.
Robinson Unit 2.
Duquesne Power and Light confirmed on June 18, 1979, that radiography has shown cracking in their to-vessel nozzle weld. Public Service El June 20, 1979 that Salem Unit I also has Service company decided on June 20, 1979 DUPLICATE DOCUMENT weld which contained questionable indica As of June 22, 1979 and since May 25, 197 Entire doctunent previcnisly inspected the feedwater nozzle-to pipe w entered into system under:
7 NOM l'"'2 353
^"