Text
WA
.
UNITED STATES
e Mc
o
NUCLEAR REGULATORY COMMisslON
y
o
REGION 1
$
$
631 PARK AVENUE
2
KING OF PRUSSI A. PENNSYLV ANI A 19406
\\,...../
Docket No. 50-423
%
Northeast Nuclear Energy Company
ATTN: Mr. W. G. Counsil
Vice President - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut 06101
Gentiemen:
Subject:
Inspection No. 79-07
This refers to the inspection conducted by Mr. A. D. Toth of this office on
August 9-10, 1979, at the Millstone Nuclear Power Station, Unit 3 at Waterford,
Connecticut of activities authorized by NRC License No. CPPR-113 and to the
discussions of our findings held by Mr. A. D. Toth with Mr. S. Toth and others
of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspec-
tion and Enforcement Inspection Report which is enclosed with this letter.
Within these areas, the inspection consisted of selective examinations of
procedures and representative records, interviews with personnel, and obser-
vations by the inspector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
l oprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
applicaMon must be accompanied by an affidavit executed by the owner of the
inforration, which identifies the document or part sought to be withheld, and
which contains a statement of reasons which addresses with specificity the
items which will be considered by the Commission as listed in subparagraph (b)
(4) of Section 2.790. The information sought to be withheld shall be incorpo-
rated as far as possible into a separate part of the affidavit.
If we do not
hear from you in this regard within the specified period, the report will be
placed in the Public Document Room.
1252 290
Q 7911 o20 %
9
.
Northeast Nuclear Energy Company
2
No reply to this letter is required; however, should you have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
_
Robert T. Carlson, Chief
Reactor Construction and Engineering
Support Branch
Enclosure:
Office of Inspection and Enforcement
Inspection Report No. 79-07
cc w/ encl:
K. W. Gray, Construction Quality Assurance Lead
H. R. Nims, Director of Nuclear Projects
J. F. Opeka, Station Superintendent
J. R. Himmelwright, Licensing Safeguards Engineer
1252 291