Forwards IE Insp Rept 50-423/79-07 on 790809-10.No Noncompliance Noted
ML19256E384
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/10/1979
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML19256E386 List:
References
NUDOCS 7911020446
Download: ML19256E384 (2)


See also: IR 05000423/1979007

Text

WA

.

UNITED STATES

e Mc

o

NUCLEAR REGULATORY COMMisslON

y

o

REGION 1

$

$

631 PARK AVENUE

2

KING OF PRUSSI A. PENNSYLV ANI A 19406

\\,...../

JEP 101979

Docket No. 50-423

%

Northeast Nuclear Energy Company

ATTN: Mr. W. G. Counsil

Vice President - Nuclear

Engineering and Operations

P. O. Box 270

Hartford, Connecticut 06101

Gentiemen:

Subject:

Inspection No. 79-07

This refers to the inspection conducted by Mr. A. D. Toth of this office on

August 9-10, 1979, at the Millstone Nuclear Power Station, Unit 3 at Waterford,

Connecticut of activities authorized by NRC License No. CPPR-113 and to the

discussions of our findings held by Mr. A. D. Toth with Mr. S. Toth and others

of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspec-

tion and Enforcement Inspection Report which is enclosed with this letter.

Within these areas, the inspection consisted of selective examinations of

procedures and representative records, interviews with personnel, and obser-

vations by the inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

l oprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

applicaMon must be accompanied by an affidavit executed by the owner of the

inforration, which identifies the document or part sought to be withheld, and

which contains a statement of reasons which addresses with specificity the

items which will be considered by the Commission as listed in subparagraph (b)

(4) of Section 2.790. The information sought to be withheld shall be incorpo-

rated as far as possible into a separate part of the affidavit.

If we do not

hear from you in this regard within the specified period, the report will be

placed in the Public Document Room.

1252 290

Q 7911 o20 %

9

.

Northeast Nuclear Energy Company

2

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

_

Robert T. Carlson, Chief

Reactor Construction and Engineering

Support Branch

Enclosure:

Office of Inspection and Enforcement

Inspection Report No. 79-07

cc w/ encl:

K. W. Gray, Construction Quality Assurance Lead

H. R. Nims, Director of Nuclear Projects

J. F. Opeka, Station Superintendent

J. R. Himmelwright, Licensing Safeguards Engineer

1252 291