ML19256E286

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-245/79-10 & 50-336/79-13 on 790501-0601.No Noncompliance Noted
ML19256E286
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 09/18/1979
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML19256E287 List:
References
NUDOCS 7911020054
Download: ML19256E286 (2)


See also: IR 05000245/1979010

Text

T

UNITED STATES

Sn nicog

o

NUCLEAR REGULATORY COMMisslON

y

n

REGION I

$

h

631 PARK AVENUE

$

KING OF PRUSSI A. PENNSYLVANIA 19406

\\...../

Docket Nos. 50-245

SEP 18 1979

50-336

Northeast Nuclear Energy Company

ATTN: Mr. W. G. Counsil

Vice President - Nuclear

Engineering and Operations

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject:

Combined Inspection 50-245/79-10 and 50-336/79-13

This refers to the inspection conducted by Mr. J. Shedlosky of this office on

May 1 through June 1,1979, at the Millstone Nuclear Power Stat %n, Waterford,

Connecticut, of activities authorized by NRC License Nos. DPR-2: and DPR-65 and

to the discussions of our findings held by Mr. Shedlosky with Mr. Opeka and

others of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

U thin

these areas, the inspection consisted of selective examinations of proceJures

and representative records, interviews with personnel, measurements made by the

inspector, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room.

If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must be

accompanied by an affidavit executed by the owner of the information, which

ideiltifies the document or part sought to be withheld, and which contains a

statement of reasons which addresses with specificity the items which wili be

considered by the Commission as listed in subparagraph (b) (4) of Section

2.790. The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affWvit.

If we do not hear from you in

this regard within the specified period, the report will be placed in the Public

Document Room.

1257 W

W

@ 2 01102o

2 .,

f

a

Northeast Nuclear Energy Company

2

No reply to this letter is required; however, if you should have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

El

n' . Brunner Ch5f

Rea tor Operations and Nuclear

Support Branch

Enclosure: Off'ce of Inspection and Enforcement Combined Inspection

Report Numbers 50-245/79-10 and 50-336/79-13

cc w/ encl:

J. F. Opeka, Station Superintendent

D. G. Diedrick, Manager of Quality Assurance

J. R. Himmelwright, Licensing Safeguards Engineer

A. Z. Roisman, Natural Resources Defense Council (Without Report)

12 5 '

? / ')

4