Forwards IE Insp Rept 50-289/79-14 on 790622,25 & 26.No Noncompliance Noted
ML19256E087
Person / Time
Site: Crane 
Issue date: 09/07/1979
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Herbein J
METROPOLITAN EDISON CO.
Shared Package
ML19256E088 List:
References
NUDOCS 7910290027
Download: ML19256E087 (2)


See also: IR 05000289/1979014

Text

  • (S

'*

g

pn

UNITED STATES

o

NUCLEAR REGULATORY COMMisslON

g

o

R EGION l

$

$

631 PARK AVENUE

KING OF PRUSSIA, PENNSYLVANIA 19406

\\...../

Docket No. 50-289

Metropolitan Edison Company

ATTN: Mr. J. G. Herbein

Vice President - Generation

P. O. Box 542

Reading, Pennsylvania

19640

Gentlemen:

Subject:

Inspection 50-289/79-14

This refers to the inspection conducted by Mr. E. P. Jernigan of this office on

June 22, 25 and 26, 1979 at Nuclear Energy Service Inc. Danbury, Connecticut of

activities authorized by NRC License No. DPR-50 and to the discussions of our

findings held by Mr. Jernigan with Mr. P. Magitz of your staff at the conclusion

of the inspection, and to a subsequent telephone discussion between Mr. Jernigan

and Mr. R. Phabhakar on June 27, 1979.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room.

If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must be

accompanied by an affidavit executed by the owner of the information, which

identifies the document or part sought to be withheld, and which contains a

statement of reasons which addresses with specificity the 'tems which will be

considered by the ConTaission as listed in subparagraph (b) (4) of Section

2.790. The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from you in

this regard within the specified period, the report will be placed in the Public

Document Room.

997

192

0G

7910290

.

.

Metropolitan Edison Company

2

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

-

Robert T. Carlson, Chief

Reactor Construction and Engineering

Support Branch

Enclosure: Office of Inspection and Enforcement Inspe: tion

Report Number 50-289/79-14

cc w/ enc 1:

E. G. Wallace, Licensing Manager

J. J. Barton, Project Manager

L- L. Lawyer, Manager - Generation Operations

G. P. Miller, Manager - Generating Station - Nuclear

J. L. Seelinger, Unit 1 Superintendent

W. E. Potts, Unit 1 Superintendent - Technical Support

I. R. Finfrock, Jr.

Mr. R. Conrad

G. F. Trowbridge, Esquire

J. Liebennan, Esquire

Miss Mary V. Southard, Chairman, Citizens for a Safe Environment

(Without Report)

99/

193