ML19256E087
| ML19256E087 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 09/07/1979 |
| From: | Robert Carlson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Herbein J METROPOLITAN EDISON CO. |
| Shared Package | |
| ML19256E088 | List: |
| References | |
| NUDOCS 7910290027 | |
| Download: ML19256E087 (2) | |
See also: IR 05000289/1979014
Text
- (S
'*
g
pn
UNITED STATES
o
NUCLEAR REGULATORY COMMisslON
g
o
R EGION l
$
$
631 PARK AVENUE
KING OF PRUSSIA, PENNSYLVANIA 19406
\\...../
Docket No. 50-289
Metropolitan Edison Company
ATTN: Mr. J. G. Herbein
Vice President - Generation
P. O. Box 542
Reading, Pennsylvania
19640
Gentlemen:
Subject:
Inspection 50-289/79-14
This refers to the inspection conducted by Mr. E. P. Jernigan of this office on
June 22, 25 and 26, 1979 at Nuclear Energy Service Inc. Danbury, Connecticut of
activities authorized by NRC License No. DPR-50 and to the discussions of our
findings held by Mr. Jernigan with Mr. P. Magitz of your staff at the conclusion
of the inspection, and to a subsequent telephone discussion between Mr. Jernigan
and Mr. R. Phabhakar on June 27, 1979.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room.
If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must be
accompanied by an affidavit executed by the owner of the information, which
identifies the document or part sought to be withheld, and which contains a
statement of reasons which addresses with specificity the 'tems which will be
considered by the ConTaission as listed in subparagraph (b) (4) of Section
2.790. The information sought to be withheld shall be incorporated as far as
possible into a separate part of the affidavit.
If we do not hear from you in
this regard within the specified period, the report will be placed in the Public
Document Room.
- 997
192
0G
7910290
.
.
Metropolitan Edison Company
2
No reply to this letter is required; however, should you have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
-
Robert T. Carlson, Chief
Reactor Construction and Engineering
Support Branch
Enclosure: Office of Inspection and Enforcement Inspe: tion
Report Number 50-289/79-14
cc w/ enc 1:
E. G. Wallace, Licensing Manager
J. J. Barton, Project Manager
L- L. Lawyer, Manager - Generation Operations
G. P. Miller, Manager - Generating Station - Nuclear
J. L. Seelinger, Unit 1 Superintendent
W. E. Potts, Unit 1 Superintendent - Technical Support
I. R. Finfrock, Jr.
Mr. R. Conrad
G. F. Trowbridge, Esquire
J. Liebennan, Esquire
Miss Mary V. Southard, Chairman, Citizens for a Safe Environment
(Without Report)
- 99/
193