Jump to navigation Jump to search
Forwards Suppl to Proposed Tech Spec Change 19
ML19256E003
Person / Time
Site: North Anna Dominion icon.png
Issue date: 10/23/1979
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML19256E004 List:
References
805, NUDOCS 7910250282
Download: ML19256E003 (2)


Text

.~ 4 VruarxrA E LEc ritic Axn Pow nit C o >t rAxv H IcIIx ox n. VI RGIN IA 2!!n 61 October 23, 1979 Mr. Harold R, Denton, Director Serial No. 805 Office of Nuclear Reactor Regulation LQA/WRM:pwc Attn: Mr. A. Schwencer, Chief Operating Reactors Branch No. 1 Docket No. 50-338 Divisicn of Operating Reactors U. S. Nuclear Regulatory Conmission License No. NPF-4 Nashington, D.C. 20555

Dear Mr. Denton:

SUPPLEMENT TO A'[E'IDMENT TO OPERATING LICENSE NPF-4 NORTH AN'!A POWER STATION UNIT NO. 1 PROPOSED TECHNICAL SPECIFICATION CHANGE NO. 19 By a letter dated August 6, 1979, we requested a change to the Technical Specifications for North Anna Power Station Unit No. 1 to make the Unit 1 Technical Specifications consistent with the proposed Unit 2 Technical Specifi-cations. Attachec are proposed Technical Specifications to supplement those submitted previously.

The enclosed changes supplement our previously submitted proposed changes to delete requirements relative to part length rods, to provide overpressure protection, and to elininate inconsistencies between Unit 1 and Unit 2 Technical Specifications in areas that are common to both units.

We have become aware that several of the copies of our August 6, 1979 sub-mittal sent to the NRC are missing several pages; therefore, the enclosed attach-ment also includes copies of these pages.

The supplemental changes are evaluated in Attachment A and are included in Attachment B. The changes marked by an asterisk in Attachment A should be made effective prior to commencenent of s tartup following the current refueling outage, which began on Septenber 25, 1979, and is scheduled to be of approximately 12 weeks duration. The other changes should be nade ef fective upon issuance of the Unit 2 license.

These proposed changes have been reviewed and approved by the Station Nuclear Safety and Operating Committee and the Systen Nuclear Safety and Operating Com-mittee. It has been determined that this request does not pose an unreviewed safety question, as defined in 10CFR50.59.

Very truly yours, Y.)) ).\ LU. >

C. M. Stallings

} Vice President-Power Supply

) -

and Production Operations At tacinent s:

(1) Supplement to Proposed Technical Specification Change No. 19 Mr. James P. O'Reilly, Director cc:

Of fice of Inspection and Enforcement h Region II 7910250 W T

e ,

COMMONWEAL'iH OF V IRGINI A )

) S. S.

CllY OF RICHMOND I Before me, a Notary Public, in and for the City and Comnon-weal th a foresaJd, today per sonally appeared C. M. Stallings, who being du l'/ sworn , made oa th and said (1) that he is Vice President-Power Sucply 3ad Production Operations, of the Virginia Electric and Power Company, (2) that he is duly authorized to execute and file the fore-going Amendment in behalf of that Company, and (3) that the statements in the Amendment are true to the best of his knowledge and belief.

Given under my hand and notarial seal this D 'd ay of

& f/hn' , Japc.

My Commission expires .)ogj wy v 2r 19() .

A W Y A W l' b '

Notary Public (SEAL) 1210 226