Responds to NRC Re Violations Noted in IE Insp Rept 50-289/75-01.Corrective Actions:Temporary Change Notices & Log Audited,Administrative Procedure 1001 Revised & Audit Tracking Sys Established
ML19256D630
Person / Time
Site: Crane 
Issue date: 03/03/1975
From: Arnold R
METROPOLITAN EDISON CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19256D629 List:
References
NUDOCS 7910190590
Download: ML19256D630 (7)


Text

-

-J=' fl/, 71LJ C u,og..

y.

g n a a nxnu

  • y _.<OPOLITAN EDISON COMPANY succioianvorcenenst rusticurittritscoaronario:.

O."

7E BOX 542 READING, PENNSYLVA J.A 19603 TELEPHONE 215 - 929 3601

~

T

=. -

March 3, 1975 z,.:

e Mr.JawesP.O'Reih.ly, Director Office of Inspection & Enforcement - Region I U.S. Nuclear Regulatory Com:nission 631 Park Avenue

~

King of Prussia, Pennsylvania 19406 e-;j

Dear Mr. O'Reilly:

Docket-No. 50-289 Operating License No. DPR-50 Inspection Report 75 -01

'Ihis letter and the attached enclosure are in response to your inspection report letter of February 7,1975, concerning Mr. Spessard's inspection

  • of our Three Mile Island Nuclear Station Unit 1 and the resultant findings of that inspection.

Sincerely, L

tP R. C.

d Vice President-Generation RCA:cas

Enclosure:

Response to Description of Apparent Violation File:

20.1.1/7.7.3.2.1 1452 170 7910190870

ENCLOSURE Metropolitan Edison Company Three } Ele Island Nuclear Station, Unit 1 Docket No. 50-289 p) Operating License No. DPR-50

_(

Inspection No. 50-289/75-01

-~

Response to Descriptions of Apparent Violations Apparent Violation 1 Criterion VI, Appendix B,10 CFR 50 states in part that, 'tMeasures shall be established to control the issuance of... procedures...in-cluding changes thereto, which prescribe all activities af fecting quality. " The FSAR Section lA, Operation Quality Assurance Plan,Section VI states in part that, "...the Generation Division document control procedure further requires ' hat each Manager and Station t

Superintendent provide in their procedures measures:...to ensure that approved changes be promptly transmitted for incorporation into documents; and to ensure that obsolete or superse'ded documents are eliminated from the system and not used..."

Contrary to the above, on November 19-20, 1974, plant hedtup was performed using a controlled copy of OP 1102-1, Rev. 4 which contained 4 TCN 's that were invalid. Additionally, on January 7,1975, the Control Room File copy of OP.1102-1, Rev. 4 still contained the 4 invalid TCN's and did not contain the one valid'TCN issued af ter the November 19-20, 1974, plant heatup evolution.

It was determin5d that the 4 invalid TCN 's were not followed during the heatup evolution.

Respons e:

a.

Although the 4 TCN's were contained within the controlled copy of OP 1102-1 Rev. 4, it should be noted th'at these invalid-TCN's were not followed during the heat up evolution of November 19-20, 1974, and therefore, there was no effect upon the quality of the performance of this work. However, the following actions were taken to resolve the problem:

1.

In addition to verifying that the 4 TCN's attached to OP 1102-1 Rev. 4 were invalid, they were cancelled and removed from-the procedure, and an audit of all effective (active) Temporary Change Notices was initiated and completed by January 30, 1975.

This audit accomplished the following:

(a) TCN's no longer requirc d for plant operations were

= _.

verified as cancelled per Admin. Procedure 1001.

(b) All. procedures to which active TCN 's were applicable were verified as having the TCN attached per Admin.

Procedure 1001.

(c) All TCN 's which~ were cancelled were verified as having been removed from all the procedure files per Admin.

Procedure 1001.

1452 171

[~~'N b.

To avoid future violations of this type:

\\

~

1.

The Administrative Procedure 1001, Control of Documents is intended to provide the appropriate administrative controls to prevent the occurrence of a noncompliance such as was disclosed. in the above violation.

Detailed review of the procedure' by responsible management indicated the procedure requires stronger controls relative to TCN cancellation to provide assurance that future compliance will be maintained.

2.

Consequently, section 3.6.4 'EIemporary ON-the-Spot Changes" of the Admin. Procedure 1001 is being revised to require the following:

(a) Assignment of an individual (Supervisor) by name who will be responsible for issuing a permanent Procedure Change Request (PCR) to replace a TCN if the temporary change is intended to be incorporated into a permanent procedure chan ge.

This requirement will identify " Permanent Frocedure Change" responsibility which is presently not defined in the procedure.

(b) That there be a 90 day maximum time period for a TCN to remain effective regardless of the circumstances.

This requirement will limit the number of effective TCN's to a less cumbersome number; will provide a date by which cancellation is imperative; wi11' enhance the overall quality of the station procedures by minimizing the number of TCI's attached to them, and will virtually eliminate the chances that TCN's will become obsolete through being active for long periods of time.

3.

The Shif t Supervisor has the responsibility for control of TCN's.

In this regard a weekly operations surveillance will be established to require the Shift Foreman or Shift Supervisor to audit the TCN Log Book.

This audit will be made to insure the following:

(a) Accuracy and completeness in the log of existing TCN's.

(b) Compliance with the Administrative Procedure 1001 relative to TCN incorporation into a procedure.

(c) TCN's are cancelled when required by either the 90 day limitation or when the TCN has fulfilled the function for which it was written, whichever occurs first.

Full compliance will be achieved as of 3/14/75.

c.

1452 172 Apparent Violation 2

[

)

10 CFR 50.59b states in part;

...the licensee shall maintain records

-/

of changes in the facility...made pursuant to this section, to the extent that such changes constitute changes in the facility as described in the safety analysis report...these records shall include a written saf ety evaluation which provides the bases for the deter-nination that the ihange,...does not $nvolve an unreviewed safety question." 10 CFR 59a states in part; "that a proposed change...

shall be deeced to involve an unreviewed safety question (1) if the probability of an accident...is increased (2) if a possibility for an accident...may be crea ted or (3) if the margin of safety...is re duc e d... "

Contrary to the above the licensee's written safety evaluations for nine design changes completed in 1974, did not provide an adequate bases for the determination that an unreviewed safety question was not involved, in that the items constituting an unreviewed safety question, as defined above, were not addressed.

Response

With regard to the nine subject design changes, subsequent audit has revealed that one of the design changes did not require a safety evaluation since the c.hange did not affect nuclear safety, and the remaining eight chang'es were properly controlled in accordance with the requirements of the GPUSC QA program for j

startup & test.

It is the licensee 's position, the,refore, that

/

the above described event does not constitute a violation.

Apparent Violation 3 Criterion XVIII, Appendix B',10 CFR 50, states. in part, "a comprehensive

~

system of planned and periodic audits shall be carried out... audit EE results shall be documented and reviewed by management having respon-sibility in the area audited..." The FSAR Section lA, Operating Quality Assurance Plan Section XVIII, states in part ; "... audit reports are transmitted...to the responsible managers or outside organizations..."

Contrary to the above, two audits conducted by the licensee (Audit Nos.

74-13 and 74-27) were not docu=ented and distributed to management having responsibilities in the areas audited.

Additionally, audit reports for two audits (Nos. 74-25 and 74-29) which were conducted on September 16, 1974 and October 28, 1974, respectively had not been issued as of January 9,1975 ; period of 115 days and 73 days,

respectively following audit performance.

Responce:

a.

The following actions have been taken to resolve the problem:

1452 173

_4

~

=

1.

Audits 74-13 and 74-27 were never complet,ed and therefore these audits could not and cannot be documented and distributed 7-to management having responsibility in the area audited.

2.

Audit 74-25 was issued on February 3,1975, and Audit 74-29 will be published by March 14, 1975.

b.

To avoid future. violations of this type:

..s 1.

The Manager-OQA will ensure that in the future audits once scheduled, will only be cancelled with his written concurrence

+-

and that the responsible management is notified of the change and reasons therefor.

2.

The Manager-OQA has established an audit tracking system and will ensure that all audits are published within 30 days of

.f the au'dit exit interview.

Full compliance will be achieved for both of the systems c.

addressed in b above by 4/4/75.

Apparent Vielation 4 Criterion XVI, Appendix b,10 CFR 50, states in part; "...that measures

...e.

shall be established to assure that conditions adverse to quality, such as..., deficiencies, deviations...and non-conformances arc

\\

promptly identified and corrected." The FSAR Section lA, Operating Quality Assurance Plan Section XVI, states in pare; "..the corrective action procedures include provisions for...the responshbility f'or timely #'4 disposition and followup action for nonconformances..."

Contrary to the above seve'ral of the licensee's nonconformances identi-fied during his audits of the quality assurance program have not re-m ceived prompt corrective action. For example, Audit Findings No. 74 4, 74-11-6, and 74-12-3 were targeted for completion by July 20, 1974; however, these were still open as of the date of the inspection, a

=

period of about 6 months.

Respons e:

Audit Finding 74-11-4 was closed on January 7,1975, and Finding a.

74-11-6 was closed on February 28, 1975.

Finding 74-12-3 was reviewed by the Plant Operations Review Cocmittee (PORC) in December 1974 and their resolution was reviewed and found to be inadequate by the Manager-OQA.

A second review is in progress by the PORC and the finding will be closed by March 15, 1975.

b.

To avoid future violations of this type, a more cocprehensite policy for followup action of open audit findings has been established by the Manager-0QA.

This system provides for actions to be taken at varying time spans f rom the established 1452 174

C's s_/

finding closcout due date. A procedure will be issued formalizing the actions, and it is anticipated that no finding will take longer than 5 weeks af ter its scheduled due date to close out.

Full compliance vill be achieved by April 4,1975.

c.

Apparent Violation 5 Technical Specification Section 6.1.Ii3.e.8) states that "The General Of fice Review Board (GORB) will review audits and audit program of

'the Generation Division."

Contrary to the above, the GORB has not perforced this review since the issuance of an operating license on April 19,1974, (a period exceeding 9 months) although the GORB held 7 meetings during the period April - October 1974.

Response :

As corrective ' actions, the CORB will ensure that a GORB a.

subcommittee:

1.

Reviews all past quafterly audit program reports and present the results at the next GORB coeting, and 2.

Based on these reviews, make recommendations as to any areas in which special GORB audits are believed to be required.

b.

To avoid further violations of this type, the General Office Review Board (GORB) ha's appointed a subcommittee with the

==

specific charter to:

1.

Conduct reviews of the Met-Ed operational quality assurance program, as it pertains to TMI, by utilizing the quarterly

"~,[

z audit program reports submitted by the tht-Ed Manager-0QA.

This action will assure that audits are being accomplished in accordance with the requirements of the Technical Specifications and ANSI 18.7-1972 " Standard Administrative Controls for Nuclear Power Plants." In addition, the subcommittee will report a summary of this review to the GORB during a scheduled meeting, and 2.

Based on these reviews, make reco=cendations as to any areas in which special GORS audits are believed to be required.

1452 175 s

9 6-Full compliance will be achieved by March 26, 1975.

O c.

Q)

General Comment

.:~.

With regard to the. degree of effectiveness to wLich our Quality Assurance Program is ittplemented, it has been determined that continued management attention to the areas of personnel training and development will' serve to strengthen QA personnel abilities to rore strongly implement and maintain the program.

=.