ML19256D613

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-289/75-07 on 750321.No Noncompliance Noted
ML19256D613
Person / Time
Site: Crane Constellation icon.png
Issue date: 04/04/1975
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Arnold R
METROPOLITAN EDISON CO.
Shared Package
ML19256D614 List:
References
NUDOCS 7910190573
Download: ML19256D613 (2)


See also: IR 05000289/1975007

Text

UNITED STATE

' ' /.

"

-

NUCLEAR REGULATORY COMMISSION

'

,

REGloN I

-

'831 PARK AVENt,E

KING OF PRUSSI A. PENNSYLVANIA 19405

'3

.

t

APR

4 1975

' -

.

}htropolitan Edison Company

License No. DPR-50

_

Attention:

Mr. R.,C. Arnold

Inspection No. 50-289/75-07

Vice President

P. O. Box 542

Reading, Pennsylvania

19603

. .

Gentlemen:

..

This refers to the inspection conducted' by Mr. Gage of this office on

March 21, 1975 at Middletown, Pennsylvania of activities authori cd by

AEC License No. DPR-50 and to the discusnions of our findings held by

Mr. Gage with Mr. Herbein of yc. tr staff at the conclusion of the in-

spection.

-

Areas exanined during this inspection are described in the Regulatory

, . ,

Operations Inspection Report which is enclosed with this letter. Within

'

these areas, the inspection consisted of selective erminations of

. procedures and representative records, interviews with personnel, and

observations by the inspector.

'

Within the scope of this inspection, no itecs of noncompliance were

observed.

%

'

In accordance with.Section 2.790 of the AEC's " Rules of Practice", Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

'

enclosed inspection report will be placed in the 'dRC's Public Document

-

Room.

If this report contains any information that you (or your con-

E

trac'.or) believe to be proprietary, it is necessary that you make a

written application within 20 days to this office to withhold such

information from public disclosure. Any such application cust include a

. _ .

full statement of *:he reasons on the basis of which it is claimed t; hat

"

the information is proprietary, and sNould be prepared so that pro-

prietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this

regard within the specified period, the. report will be placed in the

Public Document Room.

.

1452

140

-

.

4oLUTIO4

h

,,

O

Ac

e

i nn

I

m

w

J.

6

m

(

\\. Sh

,

7910190 g73

w .w o

'

o

-

.

.

m

.

-

,

.

.

.

.2-

m

-

)

/

No reply to this letter is required; however, should 3ou have any

' " -

questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

.

.

%

e

lgl

M

-

Robert T. Carlson, Chief

~

. Facility Construction and Engineering

Support Branch

.

,

Enclosure:

IE Inspection Report No. 50-289/75-07

,,

cc:

J. G. Herbein, Station Superintendent

"

,

R. W. Heward', Project Manager, GPUSC

.

.......

_

..

. .

. . . . . . , .

~'

'

.

bec:

IE Chief, FS&E3

-

.

IE:HQ (4 cys ltr, 5 cys report)

IE Files

Central lhil & Files

.'

Directorate of Licensing (4 cys ler,13 cys report)

-

Regulatory Standards (1 cy ler, 3 cys report)

.

PDR

-

'

,

Local PDR

..

NSIC

-

.

-

TIC

'

-

REG:I Reading Room

Region Directors (II, III, IV) (Report only)

.

OGC

,,

State of Pennsylvania

"

Miss Mary V. Southard, Chairman, Citizens for a

.

Safe Environment

.

.

..

.

.

'

'

,. .

-

.1452~141

.

.

.

_

.

%

e

I

.

_-

.

,

"

..

.

.

.

.

.