Forwards IE Insp Rept 50-289/75-12 on 750611-12.No Noncompliance Noted
ML19256D601
Person / Time
Site: Crane Constellation icon.png
Issue date: 06/20/1975
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Arnold R
METROPOLITAN EDISON CO.
Shared Package
ML19256D602 List:
References
NUDOCS 7910190565
Download: ML19256D601 (2)


See also: IR 05000289/1975012

Text

.' '. . :

.

..

UNITED STATES

'

p

.

,

NUCLEAR REGULATORY COMMISSION

-

[

REGloN I

_

$31 PARK AVENUE

.

O

KING OF PRUSSI A. PENNSYLVANI A 19406

,

i

.,J

i --

ym 2 01575

V

fif:

Metropolitan Edison Company

License No. DPR-50

Attention:

Mr. R. C. Arnold

Inspection No. 75-12

d

Vice President

Docket No. 50-289

'A

P. O. Box 542

F

Reading, PA 19603

b

Gentlemen:

,.

This refers to the inspection conducted by Mr. Durr of this office on

June 11-12, 1975 at Middletown, Pennsylvania of activities authorized by

NRC License No. DPP.-50 and to the discussions of our findings held bi

Mr. Durr with Mr. Herbein of your staff at the conclusion of the is

spection.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

-

observed.

-

-

,

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part

2, Title 10, Code of Federal Re::ulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any infomation that you (or your con-

tractor) believe to be proprietary, it is necessary that you make a

written application within 20 days to this office to withhold such

infomation from public disclosure. Any such application must include a'

full statement of the reasons on the basis of which it is claimed that

the infomation is proprietary, and should be prepared so that pro-

prietary infomation identified in the application is contained in a

ceparate part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

.

.

1452 094

otuilOS

O

b

UNS

$($$)

5di[

~ l.

'i-*'"

7910190

'y

-

-

,

'

.

,

-2-

{

it'

'

.

No reply to this letter is required; however, should you have any

questions concerning this inspection, we will be pleased to discuss them

.

with you.

bn

Sincerely,

p

,

-

.

.df

WW

Robert T. Carlson, Chief

Facility Construction and Engineering

Support Branch

Enclosure:

IE:I Inspection Report No. 50-289/75-12

cc:

J. G. Herbein, Station Superintendent

R. W. Heward, Project Manager, GPUSC

bec:

IE Chief, FS&EB

[

IE:HQ (4 cys ler, 5 cys report)

, ' ' ,

IE Files

-

(

.

Central Mail & Files.

.

Directorate of Licensing (4 cys ltr, 13 cys report)

Regulatory Standard; (1 cy ltr, 3 cys report)

PDR

Local PDR

NSIC

TIC

REG:I Reading Room

.

Region Directors (II, III, IV) (Report Only)

ELD

State of Pennsylvania

Miss ;bry V. Southard, Chairman, Citizens for a

Safe Environment

.

1452 095

-

.__

%

.

I