I '.
i
m
/;, ' . 7.~ ~-e.,ff,,.6,,,
,
-
,
UNITED STATES
b ~^
'/*
NUCLEAR REGULATORY COMMISSION
REGloN I
- .
$31 PARK AVENUE
KING OF PRUS$1' . PENNSYLVANIA 19406
'
A
J
-
DEC 8
1975
.
.
.
Metropolitan Edison Company
License No. DPR-50
Attention:
Mr. R. C. Arnold
Inspection No. 75-26
.
Vice President
Docket No. 50-289
P. O. Box 542
Reading, PA 19603
'
Gentlemen:
This refers to the verification tests performed during the inspection
conducted by Mr. Everett of this office on July 22, 30, 31, and
August 1, 1975 at the Three Mile Island Nuclear Power Station,
Middletown, Pennsylvar.la of activities authorized by NRC License No.
The results of that inspection are contained in our letter
dated August 14, 1975 which includes the Office of Inspection and
Enforcement Inspection Report No. 50-289/75-16 as an enclosure.
The results of our verification tests made at the time of that inspec-
tion are included in the Office of Inspection and Enforcement Inspection
Report which is enclosed with this letter.
Other aspects of the inspec-
tion were previously discussed in the above referenced correspondence.
,
Within the scope of this inspection, no ite=s of noncomplianc~e were
observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
?
Room.
If this report contains any information that you (or your con-
"
tractor) believe to be proprietary, it is necessary that you make a
written application within 20 days to this office to withhold such
..
infor=ation from public disclosure. Any such application must include a
full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that pro-
prietary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this'
reg ,d within the specified period, the report will be placed in the
Pub a c Document Room.
7
,
/./ ) -
1451
266
4ctOTrop
d [%d t M, b
-
e b A vi.' 9
E.,l 5
b% t /
g.ge
7910190
S
t
.
.
.
.
.
.
-2-
,,. /.
-
,
.
No reply to this letter is required; however, should you have any
questions concerning this inspection, we will be pleased to discuss
them with you.
--
Sincerely,
.L
e
i
-
Paul R. Nelson, Chief
~
Fuel Facility and Materials Safety
'
Branch
,
'
Enc.1,:;sure:
Region I Inspection Report No. 50-289/75-26
cc:
J. G. Herbein, Manager, Generation Operations - Nuclear
R. W. Heward, Project Manager, GPUSC
Hiss Mary V. Southard, Chairman, Citizens for a Safe Enirironment
(Without Report)
. . . .
. . . . . . .
. - - . . ... .
. . . .
.
.
. , , , ._.
bec:
IE Mail & Files (For Appropriate Distribution)
.
q
,
'
Local.PDR
r
-
2 .
.'
'
REG:I Reading Room
-
- -
Region Directors (II, III, IV) (Report Only)
State of. Pennsylvania
.
4
Miss Mary V. Southard, Chairman, Citizens for a
.
Safe Envitonment
c
. . . . ,
_
_
,,, , _ _ _ , _ _
_ _ _ _
_._
,___y
- . . . - . .
. . . . . . . . .
. . . . .
..
-
.
..
..
1451
267
..
.
-,
.J
.
..