Forwards Insp Rept 50-289/73-09 on 730814-15.No Noncompliance Noted
ML19256D525
Person / Time
Site: Crane Constellation icon.png
Issue date: 08/27/1973
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: John Miller
METROPOLITAN EDISON CO.
Shared Package
ML19256D526 List:
References
NUDOCS 7910180837
Download: ML19256D525 (2)


See also: IR 05000289/1973009

Text

'

p.

s.

,

'

UNITED STATES

[, "*

ATOMIC ENERGY COMMISSION

.P

DIRECTOR ATE OF REGULATORY OPER ATION$

,

REGION 9

.

.

.mau !1 R L J H L 2

.1 J L I

l.

1

k*# ,,,,n

p ##[

AUG 2 71973

urwanv u r m

_t r o c e v nvens

.

631 Park Avenue

King of Prussia, Pennsylvania

19406

Metropolitan Edison Company

Docket No. 50-289

Attention:

Mr. J. G. liiller

Vice President

Box 542

Reading, Pennsylvania

19603

Gentlemen:

.

This refers to the inspection conducted by Mr. Rebelowski of this office

on August 14-15, 1973 at the Three Mile Island 1 Plant Middletown, Penn-

sylvania of activities authorized by AEC Construction Permit No. CPPR-40

and to the discussions of our findings held by Mr. Rebelowski with

Mr. Klingaman, Mr. Herbein, Mr. Barton, and other members of your staff

at the conclusion of the inspection visit.

'

Areas examined during this special inspection were limited to the

Initial Reactor Building Leak Rate Test. Within this area, the inspection

consisted of examination of a draf t procedure and representative records,

t

interviews with plant personnel, and observations by the inspectors.

'

Within the scope of this inspection, no violations or safety items were

observed.

'

In accordance with Section 2.790 of the AEC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the AEC's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within twenty (20) days to this office to

withhold such information from public disclosure. Any such application

must include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared

so that proprietary information identified in the application is con-

tained in a separate part of the document.

If we do not hear from you

in this regard within the specified period, the report will be placed

in the Public Document Room.

.

1451

145

g

37

"

1910180 4 !

/

-

.

.

. - _

'

.

.

.

-

AUG 2 7 W3

.

p-

_2-

_

_

.

Should you have any questions concerning this inspection, we will

be pleased to discuss them with you.

Sincerely,

'

__

J

-

El on J. Brunner, Chief

Facility Test and Startup Branch

!-

!

I

Enclosure:

R0 Inspection Report No. 50-289 h

j

R. C. Arnold, Manager of Production, Met Ed

cc:

R. M. Klingaman, Superintendent

Three Mile Island Uuclear Station

.

R. W. Heward, Project Manager, GPUSC

T. M. Crimmins, Jr. , Safety and Licensing Manager, GPUSC

-

bec:

R0 Chief, Field Support & Enforcement Branch, HQ

,g

./

RO:HQ (4)

Directorate of Licensing, HQ (4)

RO Files

MDR Central Files

Central Mail & Files

CC

PDR'

Local PDR

l

NSIC

I

DTIE

State of Pennsylvania

i451

146

'

,

f

.

L_ .:

@

_

_.

-_-

-

.-

.

.