Forwards Insp Rept 50-289/73-11 on 730820-23.No Noncompliance Noted
ML19256D512
Person / Time
Site: Crane Constellation icon.png
Issue date: 09/14/1973
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: John Miller
METROPOLITAN EDISON CO.
Shared Package
ML19256D513 List:
References
NUDOCS 7910180829
Download: ML19256D512 (2)


See also: IR 05000289/1973011

Text

- - -

- -

--

_ - . . . - . .

..

.

.. .

._

.

_ . . . . . _ . _ _ _

.-

'

'

'

...

.

~

-

s

UNITED STATES

ptstr c

ATOMIC ENERGY COMMISSION

y

g

DeRECTOR ATE OF REGULATORY OPER ATIONS

(*

H

.,- ."'" "_I .-_

j

l -

e

5

m- R5.GE5:'[-7 ':::::

,

% o'

631 Park Avenue

King of Prussia, Pennsylvania

19406

September 14, 1973

~

Metropolitan Edison Company

Docket No. 50-289

Attention:

Mr. J. G. Miller

Vice President

.

P. O. Box 542

Reading, Pennsylvania

19603

Gentlemen:

This refers to the inspection conducted by Mr. Spessard of this office

on August 20-23, 1973 at the Three Mile Island 1 Plant, Middletown,

Pennsylvania of activities authorized by AEC Construction Pcrmit No.

,

CPPR-40 and to the discussions of our firidings held by Mr. Spessard

with Messrs. Heward, Herbein, Barton and Miller on August 22, 1973

and with Messrs. Barton and Miller at the conclusion of the inspection

on August 23, 1973. This also refers to a subsequent telephone discussion

,

between Mr. Spessard and Mr. Miller on August 24, 1973.

O

/

Areas examined during this inspection are described in the Regulatory

Operations Inspection Report which is enclosed with this letter.

Within these areas, the inspection consisted of selective examination

of procedures and representative records,~ interviews with plant personnel

l

and observations by the inspectors.

,

i

Within the scope of this inspection, no violations or safety items were

!

observed.

t

In accordance with Section 2.790 of the AEC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the AEC's

Public Document Room.

If this report contains any information that

you (or your contractor) believe to be proprietary, it is necessary

that you make a written application within 20 days to this office to

withhold such information.from public disclosure. Any such application

must include a full statement of the reasons on the basis of which 1t

is claimed thct the information is proprietary, and should be prepared

so that proprietary information ider.tified in the application is con-

tained in a separate part of the document.

If we do not hear from you

in this regard within the specified period, the report will be placed

in the Public Document Room.

1451

071

Q

.

n

7910180 A.

1

'

-

.

.,

wg

n.-- - . .

.-.

. .- ..- -

. -.

.

__

..

. .

, . . _ - _ _ . ...

.

. .

- - - -

- - .

-

,

'

'

,

.

!

-2-

'

,

Should yoa have any questions concerning this inspection, we will

be pleased to discuss them with you.

-,

Sincerely,

-

__

-

El on J. Brunner, Chief

-

l

Facility Test and Startup Branch

9

9

i

Enclosure:

RO Inspection Report No. 50-289 73-11

cc:

R. C. Arnold, Manager of Production, Met Ed

'

R. M. K11ngaman, Superintendent

,

Three Mile Island Nuclear Station

.!

R. W. Heward, Project Manager, GPUSC

I

T. M. Crimmins, Jr., Safety and Licensing Manager, GPUSC

,

I

bec:

RO Chief, Field Support & Enforcement Branch, HQ

l (~T

RO:HQ (4)

,

Directorate of Licensing, HQ (4)

R0_ Files

Centr $1 Mail & Files

GC

PDR

Local PDR

NSIC

145,i

072

DTIE

.

'

State of Pennsylvania

'

.

W

0

e

.-

-e.

m. w

we,-w e.==w

_ =

e--

N ---.= m --

--,---==v-.--

- - -

- - - . . . - - - - . -

.--