ML19256D499

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-289/73-05 on 730508-09,16-18;0604-05 & 19-21.No Noncompliance Noted
ML19256D499
Person / Time
Site: Crane 
Issue date: 08/09/1973
From: Howard E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: John Miller
METROPOLITAN EDISON CO.
Shared Package
ML19256D500 List:
References
NUDOCS 7910180822
Download: ML19256D499 (2)


See also: IR 05000289/1973005

Text

'

5

.

.,

.

,

,

UNITED ST AT ES

jag,

ATOMIC ENERGY COMMISSION

-.

,,

%

l

DIRECTOR ATE OF REGULATORY OPER ATIONS

g

"" "'

.l

x.

m

i

,.

Mc>ancansrarrr

-

_

k-

MMe!MO2(RN%tCESCE:cTIRI

- '

631 Park Avenue

n,,n p

King of Prussia, Pennsylvania 19406

'

1

!'

AUG

0IE73

Docket No. 50-289

Metropolitan Edison Company

Attention: Mr. J.G. Miller ,

Vice President

I

P.O. Box 542

Reading, Pennsylvania 19603

.

1

.

Gentlemen:

J

This refers to the inspection conducted by Mr. Folsom of this office on

May 8-9, 16-18, 1973, of site activities authorized by AEC License No.

CPPR-40 and to the discussions of our findings held by Mr. Folsom with

,

!

Mr. Heward and members of your staff at the conclusion of the inspection.

,

Areas examined during this inspection are described in the Regulatory

Within

Operations Inspection Report which is enclosed with this letter.

these areas the inspection consisted of selective examinations of

procedures and representative records, interviews with plant personnel

[

and observations by the inspector.

Within the scope of this inspection, no violations or safety ite=s were

'

2

observed.

.

In accordance with Section 2.790 of the' AEC's " Pules of Practice Part 2,

Title 10, CcJe of Federal Regulations, a copy of this letter and the

j

enclosed inspection report will be placed in the AEC's Public Document

Room.

If this report contains any information that you (or your

contractor) believe to be proprietary, it is necessary that you make a

j

written application within 20 days to this office to withhold such

infort:ation from public disclosure. Any such application must inc'ude a

'.

full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

'

information identified in the application is contained in a separate part

}

of the document.

If we do not hear from you in this regard within the

specified period, the report will be placed in the Public Document Room.

1451

022

,

9910180

.

-

Yh

V'

.

.

.

. - .

-

,

~

-2-

,3

i i

m

Should you have any questions concerning this inspection, we vill be

pleased to discuss them with you.

Sincerely,

E. Morris Howard, Chief

Facility Ccastruction and

Engineering Support Branch

Enclosare s

,

RO Inspection Report 50-289L13-0

bec: RO Chief, Reactor Construction Branch, HQ

RO:HQ (4)

Directorate of Licensing, HQ (4)

M R Central Files

'

RO Files

_

Central Mail and Files

GC

PDR

Local PDR

NSIC

(-

DTIE

O

State of Pennsylvania

.

1451

023

1

%

.

9

>

.

l

w