ML19256D472

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-289/73-16 on 730927-28 & 1001-02.No Noncompliance Noted
ML19256D472
Person / Time
Site: Crane 
Issue date: 10/29/1973
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: John Miller
METROPOLITAN EDISON CO.
Shared Package
ML19256D473 List:
References
NUDOCS 7910180804
Download: ML19256D472 (2)


See also: IR 05000289/1973016

Text

'

'

~

UNITED STATES

,,, ,

ATOMIC ENERGY COMMISSION

q

-

g

g

4

DIRECTOR ATE OF RECULATCHY OPER ATIONS

,j

'{

y

REcloN 9

631 P ARK AVENUE

C

KING oF PRUSSI A, PENNSYL.VANI A 19406

0CT 2 31973

A

If %

Metropolitan Edison Company

Docket No. 50-289

Attention:

Mr. J. G. Miller

License No. CPPR-40

Vice President

P. O. Box 542

Reading, Pennsylvania

19603

Gentlemen:

This refers to the inspection conducted by Mr. Folsom of this office

on September 27 and 28 and October 1 and 2, 1973 at Middletown,

Pennsylvania of activities authorized by AEC License No. CPPR-40 and

to the discussions of our findings held by Mr. Folsom with Mr. Avers

and Fr. Heward of your staff at the conclusion of the inspection.

,

Areas examined during this inspection are described in the Regulatory

'

Operations Inspection P.eport which is enclosed with this letter. With-

in these areas, the inspection consisted of selected examinations of

procedures and representative records, interviews with plant personnel

and observations by the inspector.

Within the scope of this inspection, no violations or safety items

were observed.

~

In accordance with Section 2.790 of the AEC's " Rules of Pract' ice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the AEC's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and'should be prepared

so that proprietary information identified in the application is con-

tained in a separate part of the document.

If we do not hear from

you in this regard within the specified period, the report will be

placed in the Public Document Room.

.

1449 U1

04

'

0

7910180 1

!

I

.

-

.. .

.

.

.

.

,.

-

.

OCT 2 9 E3

'.

l

-2-

,a

Should you have any questions concerning this inspection, we will

be cleased to discuss them with you.

.

Sincerely,

O

'

4= x2

R. F. Heishman, Acting Chief

Facility Construction and Engineering

Support Brsach

Enclosure:

RO Inspection Report No. 50-289 73-16

,

.

bec:

RO Chief, Field Support and Enforcement Branch, HQ

RO:HQ (4)

Directorate of Licensing, HQ (4)

R0 Files

Central Mail and Files

GC

PDR

,

Local PDR

NSlC

DTIE

Commonwealth of Pennsylvania

,

!

I

1449 272

.

e

. - -

. + . , . ..-

-m.

.-- . - - . - -

.-~

-

- . .