Forwards Insp Rept 50-289/74-34 on 741120-21 & Notice of Violation
ML19256D448
Person / Time
Site: Crane Constellation icon.png
Issue date: 12/20/1974
From: Nelson P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Arnold R
METROPOLITAN EDISON CO.
Shared Package
ML19256D440 List:
References
NUDOCS 7910180784
Download: ML19256D448 (3)


See also: IR 05000289/1974034

Text

' "

UNITED ST ATES

  1. %

,

' [ s .i, j

ATOMIC ENERGY COMMISSION

p-

-

nr.cio s ,

oincevona rc or accut.are ny arena rious

'

' ,

.5 * g',

[ *,

'

,

  • O

l.*

.

l.

631 P ARK AVfENUE

KING OF PRUSSI A PENNSYLVANIA 194C6

N

s

',

Y.

.

, in i

g

.

DEC 2 01974

Metropolitan Edison Company

License No. DPR-50

Attention:

Mr. R. C. Arnold

Inspection No. 50-289 4-34

Vice President

P.O. Box 542

Reading, Pennsylvania

19603

Geaticsan:

This refers to the inspection conducted by Mr. Bores of this

office on November 20 and 21,1974 at Three Mile Island

Nuclear Station of activities authorized by AEC License No.

DPR-50 and to the discussions of our findings held by Mr.

Bores with Mr. Herbein and other menbers of your staff at the

conclusion of the inspection, and to a subsequent telephone

,

discussion betueen Mr. Bores of this office and 11r. Herbein

.

,.

on Nove=ber 25, 1974.

Areas examined during this inspection are described in the Regulatory

Operations Inspection Report which is enclosed with this letter.

Within these areas, the inspection consisted of selective e.xaminations

~

of' procedures and representative records, interviews with personnel,

'

-

and observations by the inspector.

Our inspector also verified the steps you had taken to correct

the violations brought to your attention in letters dated

March 29, 1974 and June 26, 1974, following our inspections.

We have no further questions regardi.g these catters.

During this inspection, it was found t:n t certain of your activities

appeared to be in violation of AEC requirements.

The itecs and

references to the pertinent requirements are listed in the enclosure

to this letter.

This letter constitutes a notice sent to you

pursuant to the provisions of Section 2.201 of the AEC's " Rules

of Practice", Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office within 20 days

of your receipt of this notice, a written state =ent of explanation

in reply, including: (1) corrective steps which have been or will

1449

155

.

79101807fg

~~ '

-

.

.

~

1

-

.

i

.

.

Metropolitan Edison Co=pany

.

] -'-

-2-

-

,1 -

.

.

be taken by you, and the results achieved; (2) corrective steps

which will be taken to avoid further violations; and (3) the

date when full ecmpliance will be achieved.

However, with regard

to Ite=s No. 1, 2 and 3, we note that these violations were

corrected prior to the ccmpletion of our inspection and therefore,

no response with respect to these mattere is required.

In accordance with Section 2.790 of the AEC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulaticus, a copy of this

letter and the anclosed inspection report will be placed in the

AEC's Public Document Room.

If this report contains any information

that you (or your contractor) believe to be proprietary, it is

necessary that you =ake a written application within 20 days to

this office to withhold such information frca public disclosure.

Any such application cust include a full state =ent of the

reasons on the basis of which it is claimed that the infor=ation

is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a

separate part of the document.

If we do not hear frca you in

this regard within the specified period, the report will be

placed in the Public Docu=ent Room.

._

Should you have any questions concerning this inspection, we will

be pleased to discuss them with you.

Sincerely,

j pf

Paul R. Nelson, Chief

Radiological and Environmental

Protection Branch

,

Enclosures:

1.

Description of Violations

2.

RO Inspection Report No. 50-289/74-34

cc:

J. G. Herbein, Station Superintendent

R. W. Heward, Project Manager, GPUSC

1449

I56

-

_.

'

...

. - - -

-

.

,

Metropolitan Edison Company

"

n

3

.

-

bec: RO Chief, FS&E3

RO:EQ (4 cpys of ler., 5 cpys of report.

10 Files

Central Mail & Files

DL (4 cpys of ler.,13 cpys of report)

RS (1 cpy of ltr., 3 epys of report)

PDR

Local PDR

NSIC

TIC

State of Pennsylvania

Reg Reg Reading Roon

10 Directors ((II, III, IV) (Report only)

OGC

Hiss Mary V. Southard, Chair =an, Citizens for a Safe Envirorment

.

6

m

B

w

1449

157

.

. -

.