Forwards Insp Rept 50-289/73-24 on 731204-05.No Noncompliance Noted
ML19256D431
Person / Time
Site: Crane Constellation icon.png
Issue date: 12/26/1973
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: John Miller
METROPOLITAN EDISON CO.
Shared Package
ML19256D432 List:
References
NUDOCS 7910180772
Download: ML19256D431 (2)


See also: IR 05000289/1973024

Text

[

UNITED STATEC

g

4

,

ATOMIC ENERGY COMMISSION

,

,,

g

DIRECTOR ATE OF REGULATORY OPER ATIONS

REGION 9

1 *l

M*

'

M5W646s%wv

O'

( ,,, , s,g

mcwxmcwwnnsvxarmc

631 Park Avenue

DEC 2 01973

King of Prussia, Pa. 19406

Metropolitan Edison Company

Docket No. 50-289

Attention:

Mr. J. G. Miller

Vice President

P. O. Box 542

Reading, Pa. 19603

Gentlemen:

This refers to the inspection conducted by Messrs. Sanders and Barker

of this office on December 4 and 5,1973, of activities authorized by

AEC License No. CPPR-40 and to the discussions of our findings held

.

by Mr. Sanders with Mr. Wright at the conclusion of the inspection.

'

I

i

Areas examined during this inspection are described in the Regulatory

-

l

Operations Inspection Report which is enclosed with this letter.

Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel,

and observations by the inspector.

s

,

l

Within the scope of this inspection, no violations or safety items

were observed.

'

In accordance with Section 2.790 of the AEC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

,

and the enclosed inspection report will be placed in the AEC's Public

,

i

Document Room.

If this report contains any information that you (or

1

your contractor believe to be proprietary, it is necessary that you

make a written application within 20 days ta this office to withhold

,

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared

so that proprietary information identified in the application is

contained in a separate part of the document.

If we do not hear from

you in this regard within the specified period, the report will be

placed in the Public Document Room.

1449

139

h

7 2

.7910180

3

f

,.

,

..

-

.

._

i

.

.

.

DEC 2 G 1973

-

-2-

,

,

No reply tc, this letter is required; however, should you have any

questions concerning this inspection, we will be pleased to discuss

them with you.

Sincerely,

-~

kN Ji/Orw f n h

Robert T. Carlson,

hief

Facility Construction and

Engineering Support Branch

'

Enclosure:

(

RO Inspection Report No. 50 278/.L,3-M 9.g,

-

I

'

.

9

i

j

bec: R0 Chief, FS&EB

O

ao:ito (5)

DL (4 w/encls plus 9 cys of Report Only)

RO Files

2)R Central Files

RS (3)

occ

.

PDR

i

Local PDR

S

NSIC

]

DTIE

State of Pennsylvania

1449

140

.

.

b

__

. . . . . .

_ _ _ _ _ _ .

l

._ _

l

l

l

1