ML19256D406

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-289/74-33 on 741024-25.No Noncompliance Noted
ML19256D406
Person / Time
Site: Crane Constellation icon.png
Issue date: 11/13/1974
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Arnold R
METROPOLITAN EDISON CO.
Shared Package
ML19256D407 List:
References
NUDOCS 7910180754
Download: ML19256D406 (1)


See also: IR 05000289/1974033

Text

I

UNITED ST ATES

[M4_

&

ATOMIC ENERGY COMMISSION

'

, \\'b-

DIRCCTOM A TE Or Ht GUL A TOH V OPE R A TIONS

'

N(.. -

,

RE GION t

'#

.O

s

' . .

631 P ARK AVENUC

s ~j

.

[

KING oF PRUSSI A, PENNSYLVANI A 19406

e,

  1. ff s 46

.

NOV 131974

Metropolitan Edison Company

License No. DPR-50

Attention:

Mr. R. C. Arnold

Inspection No. 50-289 74-33

Vice President

P.O. Box 542

Reading, Pennsylvania

19603

Gentlemen:

This refers to the inspection conducted by Mr. Spessard of this

office on October 24 and 25,'1974 at Three Mile Island Unit 1,

Middletown, Pennsylvania of activities authori::ed by AEC License

No. DPR-50 and to the discussions of our findings held by Mr.

Spessard with Mr. Colit: and other members of your staff at the

conclusion of the inspection.

Areas examined during this inspection are described in the Regulatory

Operations Inspection Report which is enclosed with this letter.

Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel,

and observations by the inspector.

b

Within the scope of this inspection, no violations or safety

items were cbserved.

In accordance with Section 2.790 of the AEC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this

letter and the enclosed inspection report will be placed in the

AEC's Public Document Room.

If this report contains any information

that you (or your contractor) believe to be proprietary, it is

neccssary that ycu make a written application within 20 days to

this office to withhold such information from public disclosure.

Any such application must include a full statement of the

reasons on the basis of which it is claimed that the information

is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a

separate part of the docu=ent.

If we do not hear from you in

this regard within the specified period, the report will be

placed in the Public Document Room.

G

89101807 D

1449 J49

.

_ _ . -

.

. .

..

.

.

.

,3

Metropolitan Edison Company

-

Q

~

.

_2-

No reply to this letter is required; however, if you should have

any questions concerning this inspection, we will be pleased to

discuss them with yea.

Sincerely,

f

._1

_-

.

-

E

n . Brunner, Chief

-

Re/ctorOperationsBranch

Enclosure:

RO Inspection Report No. 50-289/74-33

cc:

J. G. Herbein, Statf on Superintendent

R. W. Heward. Pro!ect Manager. GPUSC

f.

-

bec:

R0 Chief, FS&EB

'

RO:HQ (4 cpys of ltr., 5 cpys of report)

]

RO Files

Central Mail & Files

DL (4 epys of ltr., 13 cpys of report)

RS (1 cpy of ler., 3 cpys of report)

PDR

Local PDR

NSIC

TIC

State of Pennsylvania

Reg Reg Reading Room

RO Directors ((II, III, IV) (Report Only)

OGC

Miss Mary V. Southard, Chair =an, Citizens for a Safe Environment

1449 J50

.

,