ML19256D245
| ML19256D245 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 05/10/1977 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML19256D184 | List: |
| References | |
| 50-289-77-11, NUDOCS 7910170757 | |
| Download: ML19256D245 (1) | |
Text
_ _ _
j
(
- License No. DPR-50 APPENDIX A NOTICE OF VIOLATION Based on the results of the NRC inspection conducted on April 4 through April 19, 1977, it appears that one of your activities was not conducted in full compliance with the conditions of your license as indicated below.. This item is a Deficiency.
Technical Specification 6.8.1 states in part, " Written procedures and administrative policies shall be established, implemented and maintained...."
Contrary to the above, at approximately 5:30 a.m. on April 17, 1977, valve LR-V7 was found shut when required by step 6.4.e.(4) of Surveillance Procedure 1303-6.1, " Reactor Building Integrated Leak Rats Test", Revision 3, dated April 9,1977, to be open, providing an improper barrier to containment leakage.
I i
1446 339
_ _ - -