Responds to NRC Re Violation Noted in IE Insp Rept 50-289/77-11.Corrective Action:Valve LR-V7 Positioned Properly & Procedure Changed to Require Initialing of Each Step
ML19256D210
Person / Time
Site: Crane Constellation icon.png
Issue date: 05/27/1977
From: Herbein J
METROPOLITAN EDISON CO.
To: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19256D184 List:
References
GQL-0727, GQL-727, NUDOCS 7910170709
Download: ML19256D210 (2)


Text

......

~./. '

.a.

.J

~

.pj

${5;)

jfMJ

\\. N

/

m nu METROPOLITAN EDISON COMPANY

.u.::-n := w -

-t > :t.: ~w-n ::' :- :r =a POST OFFICE BOX 542 READING, PENNSYLVANI A 19603 TELEPHONE 215 - 929 3601 May 27, 1977 GQL 0727 Mr. Elden J. Brunner, Chief Reacter Operations and Nuclear Suppcrt Branch U. S. Nuclear Regulatory Cce:11ssion 631 Park Avenue King of Prussia, Pa.

19h06

Dear Mr. Brunner:

Decket No. 50-289 Operating License No. EPR-50 Three Mile Island Nuclear Station, Unit I Inspection Report No. 77-11 The letter and the enclosure are in respense to ycur inspection letter of

)

May 12, 1977, concerning Mr. J. Higgins inspection of TMI-1 and the resultant 6 ~'

Cnding of ene (1) apparent deficiency.

Sincerely, s

/

J. G. Herbein Vice President JGH:j=r Enclosure File: 02.0016.0001.0001.02 02.0016.0001.0001.03

'l446 33e3

! 7910170 7 O I

,.a

.r m

Y Metropolitan Edison Cc=pany

,Three Mile Island Nuclear Station, Unit I Docket No. 50-287 License No. EPR-50 Inspection No.

77-11 Arcarent Violation Technical Specification 6.8.1 states in part, " Written procedures and ad-

=inistrative policies shall be established, imple=ented and =aintained..."

Contrary to the above, at approxinately 5:30 a.=.

on April 17, 1977, valve LR-V7 was found shut when required by step 6.h.e. (h) of Surveillance Procedure 1303-6.1, " Reactor Building Integrated Leak Rate Test", Revision 3, dated April 9,1977, to be open, providing an i=prcper barrier to con-tain=ent leakage-Response to Arparent Violatien i

The valve (LR-V7) vas positioned properly prior to taking the acceptable leak rate data therefore having no effect en the final results.

The step in the procedure which was violated, required the positioning of I

two (2) valves. However, only one (1) valve vis positicaed before going on to the next step. The procedure vill be changed to require initialing each step when it is perfor=ed. This will assure a correct operation and should,

i preclude a repetition of this occurrence.

O This procedure revision vill be in effect prior to the next perfor=ance of this procedure.

~

A 1446 336 m

- -.