ML19256D155

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-289/77-33 on 770531-0602.No Noncompliance Noted
ML19256D155
Person / Time
Site: Crane Constellation icon.png
Issue date: 11/10/1977
From: Nelson P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Herbein J
METROPOLITAN EDISON CO.
Shared Package
ML19256D156 List:
References
NUDOCS 7910170652
Download: ML19256D155 (2)


See also: IR 05000289/1977033

Text

_ . _ _ _ _ . . _ .

_

_ _ _ _ . .

_ . . _ . _..

C&7XA L FILdf

-

.

/*"%

t

UNITED STATES

g%

NUCLEAR REGULATORY COMMISSION

q ) "i')

l

(

S

REGION I

% g.3);, y

,

su . ax avenue

nina or raussia. nenusvevania is4os

s,;

y

NOV 101977

Docket No. 50-289

e

Metropolitan Edison Company

ATTN: Mr. J. G. Herbein

Vice President

P. O. Box 542

Reading, Pennsylvania 19603

Gentlemen:

Subject:

Inspection 50-289

'

This refers to the verification tests performed during an inspection

conducted by Dr. C. J. Paperiello of this office on May 31 - June 2,

I

1977, at the Three Mile Island Nuclear Station, Unit 1, of activities

authorized by NRC License No. DPR-50.

The results of that inspection

.

are contained in our letter dated June 17, 1977, which included Office

i

~)

of Inspection and Enforcement Inspection Report Nos. 50-289/77-17 and

'

50-320/77-21.

.

The results of our verification tests made at the time of that inspection

are included in the Office of Inspection and 2nforcement Report which is

enclosed with this letter.

Other aspects of the inspection were previously

discussed in the above referenced correspondence.

These results were

discussed with Mr. J. O'Hanlon and others of your staff in a telephone

conversation with Dr. Paperiello on October 28, 1977.

'

Within the scope of this inspection, no items of noncompliance were

observed.

In accordance with Section 2.790 of the NRC's " Rules of Prectice," Part

2, Ntle 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your con-

tractor) believe to be proprietary, it is necessary that you make a

written application within 20 days to this office to withhold such

information from public disclosure.

Any such application must be accom-

panied by an affidavit executed by the owner of the information, which

identifies the document or part sought to be withheld, and which centains

'

1446 276

g,

w

7910170

.

.

.

-_

__

-

.

.

.

Metropolitan Edison Company

2

.

a statement of reasons which addresses with specificity the items which

will be considered by the Commission as listed in subparagraph (b)(4) of

Section 2.790.

The .infcrmation sought to be withheld shall be incorporated

as far as possible into a separate part of the affidavit.

If we do not

hear from you in this regard within the specified period, the report

will be placed in the Public Document Room.

No reply to this letter is required; however, should you have any

questions concerning this inspection, we will be pleased to disetiss them

with you.

,

Sincerely,

___ / b

-

Paul R. Nelson, Chief

Fuel Facility and Materials Safety

Branch

Enclosure:

Office of Inspection and Enforcement Inspection Report

Number 50-289/77-33

cc w/ enc 1:

L. L. Lawyer, Manager, Generation Operations - Nuclear

G. P. Miller, Superintendent

J. P. O'Hanlon, Unit 1 Superintendent

R. W. Heward, Project Manager, GPUSC

Miss Mary V. Southard, Chairman, Citizens for a Safe Environment

(Without Report)

1

1446 277

_--

_ . . .

.-

_.

-

.

- . -