PNO-79-215A:updates PNO-79-215 on 790710.Licensee Provided Results of Addl Testing Which Identified Test Failure Rate of 15% for Piping Supports During 790706 Meeting W/Nrc Representatives
ML19256C954
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 07/10/1979
From: Bryan S, Klinger G, Nolan F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PNO-79-215A, NUDOCS 7910150783
Download: ML19256C954 (1)


Text

PRELIMINARY NOTIFICATION July 10, 1979 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-79-215A b-This preliminary notification constitutes EARLY notice of an event of J

POSSIBLE saf 2ty or public interest significance.

The information presented is as initially received without verification or evaluation and is basically all that is known by IE staff on this date.

Facility:

Iowa Elec'ric Light and Power Company Duane Arnold Energy Center (DN 50-331)

Palo, IA

Subject:

IE BULLETIN NO. 79-02, REVISION 1, " PIPE SUPPORT BASE PLATE DESIGNS USING CONCRETE EXPANSION ANCHOR BOLTS" - PRELIMINARY TEST RESULTS The purpose of this preliminary notification is to update a previous notification on the same topic.

Preliminary Notification (PNO-79-215) dated July 5, 1979, describes the preliminary results of the testir.g of concrete expansion anchor bolts at Duane Arnold.

A meeting was held on July 6, 1979, in Bethesda, Maryland, with representatives of NRC and Iowa Electric to discuss the results of testing and the proposed correction for pipe supports not meeting seismic design require-ments.

The licensee provided results of additional testing which identified a test failure rate of approximately 15% for piping supports in a sample of 34 supports.

The licensee is evaluating operability of a*fected safety relateo systems and the inference on the balance of plant systems as a consequence of the test failure rate.

The results of this analysis along with an evaluation of the effect of anchor bolt installation in concrete block walls are committed to be reported to the NRC on July 10, 1979.

An Immediate Action Letter was issued to the licensee on July 6, 1979, to confirm these commitments.

Contact:

G. Klingler IE, 28019 F. Nolan IE, x28019 S. Bryan IE, x28019 Distribution:

Transmitted H St Chairman Hendrie Commissioner Bradford S. J. Chilk, SECY Commissioner Kennedy Commissioner Ahearne C. C. Kammerer, CA Commissioner Gilinsky ACRS (For Distribution)

Transmitted:

MNBB ~

H. R. Denton, NRR Region W m.ys P. Bldg.. c V. Stello, IE L. V. Gossick, EDO H. L. Ornstein, EDO R. C. DeYoung, NRP, J. J. Fouchard, PA R. J. Mattson, NRR

> U,E M N. M. Haller, MPA D. Vassallo, NRR (MAIL)

R. G. Ryan, OSP D. Eisenhut, NRR J. J. Cummings, OIA H. K. Shapar, ELD SS Bldg R. Minogue, SD W. J. Dircks, NMSS S. Levine, RES 1AA7 N9 PRELIMINARY NOTIFICATION 7DIO150 M M