PNO-79-252:util Has Been Informed by Bechtel That 8 Snubbers & 2 Hangers May Have Design Deficiency.Transient/Dynamic Loads from Closure of Mainsteam Stop Valve Were Not Considered in Design of These Supports
ML19256C907
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 07/16/1979
From: Bryan S, Mckee P, Stone J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PNO-79-252, NUDOCS 7910150731
Download: ML19256C907 (1)


Text

-

2 3

PRELIMINARY NOTIFICATION July 16; 1979 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-79-252 1

This preliminarv notification constitutes EARLY notice of an event of 1,

POShiBLE safety or public interest significance.

The information

/.'

presented is as initially received without verification or evaluation

[j and is basically all that is known by IE staff on this date.

'd FACILITY:

Arkansas Power and Light Company Arkansas Nuclear One (ANO), Unit 1 Russellville, Arkansas Docket No. 50-313

SUBJECT:

POSSIBLE DESIGN DEFICIENCY IN THE SEISMIC SUPPORTS ON THE MAIN STEAM LINES WITHIN THE REACTOR BUILDING AP&L has been informed by Bechtel that eight (8) snubbers and two (2) hangers on the main steam line between the steam generators and the reactor building wall of Unit One may have a design deficiency.

The transient /dynatic loads from closure of the main steam stop valve were not considered in the design of these supports.

During closure of the main steam stop valves the applied load may exceed the design load.

AP&L expects to receive a design change for these pipe supports from Bechtel July 16 or 17.

The unit is currently in cold shutdown for an inspection of a low pressure turbine and will remain in this mode pending co=pletion of any required modifications to the seismic supports.

A press release is not planned.

Region IV was initially notified of this event at 12:15 p.c.

on July 14, 1979 by the IE Resident Inspector.

This information is current as of 2:00 p.m. on July 16, 1979.

Conta ct :

J. Stone, IE x28019; P. McNee, IE x28019; S. Bryan, IE x28019 Distribution:

Transmitted H St Chairman Hendrie Commissioner Bradford S. J. Chilk, SECY Cc=issioner Kennedy Co==issioner Ahearne C. C. Nammerer, CA Com:issioner Gilinsky ACRS (For Distribution)

Transmitted:

MNBB P. Bldg t.'- 5 V. Stello, IE L. V. Gossick, EDO H. R. Denton, NRR Region 1\\1 E. L. Omstein, EDO R. C. DeYoung, NRR J. J. Fouchard, PA R. J. Mattson, NRR N. M. Ealler, MPA R. S. Boyd, NRR (MAIL)

R. G. Ryan, OSP SS Bldg J. Cummings, OIA H. N. Shapar, ELD W. J. Dirchs, NMSS R. Minogue, SD S. Levine, RES PRELIMINAR[ NOTIFICATION gtg 300 7910150 7 3 / D

.