PNO-79-280:on 790724,fire Occurred in Exhaust Manifold of Diesel Generator.Caused by Buildup of Carbon & Fuel in Exhaust Manifold.Fire Was self-extinguished When Generator shut-down Automatically on High Exhaust Temp
ML19256C878
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/25/1979
From: Bryan S, Klinger G, Nolan F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PNO-79-280, NUDOCS 7910150610
Download: ML19256C878 (1)


Text

PRELIMINARY NOTIFICATION kb July 25, 1979 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-79-280 j

This oreliminary notification constitutes EARLY notice of events of POSSIBLE h

safety or oublic interest sionificance.

The information presented is as initially received without verification or evaluation and is basically all tnat.is known by IE staf f on this date. -

FACILITY:

Florida Power Corporation

~

Crystal River, Unit No. 3 Docket No. 50-302 Crystal River, Florida

SUBJECT:

FAILURE OF EMERGENCY DIESEL GENERATOR UURING SURVEILLANCE TESTING On July 24,1979, during required surveillance testing of both emergency diesei generators, a fire occurred.in the exhaust manifold of one diesel generator.

Ti'e fire was self extinguished when the diesel generator automatically shut down on high exhaust temperature.

Damage was limited to the insulation of electrical wiring associated with the diesel that was overheated due to proximity to the exhaust manifold.

The fire is believed to have been caused by a buildup of carbon and fuel in the exhaust manifold.

A diesel manufacturer representative is due onsite today.

The licensee estimates that reactor startup following the current refueling outage may be delayed 2 to 4 days.

Local media interest is anticipated.

Neither the licensee nor the NRC plans to issue a news release.

The State of Florida has been informed.

Region II (Atlanta) received notification of this. occurrence by telephone from the onsite inspector at 9:00 a.m. on July 25, 1979.

Contact:

G. Klingler IE, x28019 F. Nolan IE, x28019 S. Bryan IE, x28019 Distribution:

Transmitted H St Chairman Hendrie Commissioner Bradford S. J. Chilk, SECY Commissioner Kennedy Commissioner Ahearne C. C. Kammerer, CA Commissioner Gilinsky ACRS (For Distribution)

Trar.smi tted:

MNBB P. B l dg l '. 2i V. Stello, IE L. V. Gossick, EDO H. R. Denton, NRR Region Ti-H.

L. Ornstein, EDO R. C. DeYoung, NRR J. J. Fouchard, PA R. J. Mattson, NRR N. M. Haller, MPA D. Vassallo, NRR (MAIL)

R. G. Ryan, OSP D. Eisenhut, NRR J. J. Cummings, 0IA H. K. Shapar, ELD SS Bldg R. Minogue, 50 W. J. Dircks, NMSS S. Levine, RES PRELIMINARY NOTIFICATION 3909

/O f

.