PNO-79-80:supplements 790406 PNO-79-75.Four-inch Section of Fuel Pin Fell Out of Assembly 2-13 from Position A-5 During Removal.Section of Fuel Pin Was Recovered.Caused by Cracking in Assembly.Assemblies Will Not Be Reinstalled
ML19256C810
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 04/11/1979
From: Bryan S, Nolan F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PNO-79-080, PNO-79-80, NUDOCS 7910120485
Download: ML19256C810 (1)


Text

.

PRELIMINARY NOTIFICATION April ll, 19/9 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-79-80 This preliminary notification constitutes EARLY notice of an event of POSSIBLE safety or public interest significance.

The information presented is as initially received without verification or evaluation and is basically all that is known by IE staff on this date.

Facility:

Dairyland Power Cooperative Lacrosse Boiling Water

~

Reactor Genoa, Wisconsin (DN50-409)

Subject:

ABNORMAL FUEL CLADDING DEGRADATION This supplements PN0-79-75 dated April 6, 1979 The licensee reported the p.reliminary results of thei. examination and sipping of the fuel.

A 4-inch section of fuel pin fell out of assembly Number 2-13 from position A-5 during the removal of this assembly.

Tiie section of fuel pin was recoverrd. The licensee also recovered the 6-inch section of fuel pin that fell out of assembly No. 2-33 which was reported in PN0-79-75.

Six other assemblies had visual indications of cracking and three had possible cracking indications.

All the fuel with defects had been scheduled for removal this refueling cycle.

Only two assemblies scheduled to go back for the next cycle had indications of leaking, one visually, the other by sipping.

These assemblies will not be reinstalled.

The license has notified the NRR Project Manager and plans to meet with NRR next week to discuss this subject.

NRC inspectors have been following the refueling.

No press release is oeing planned at this time by RIII or the licensee.

The State of Wisconsin has been notified.

Contact:

FNolan, IE x28015; SBryan, IE x28019 Distribution:

Transmitted H St [ 37 Chairman Hendrie Commissioner Bradford S. J. Chilk, SECY Commissioner Kennedy Commissioner Ahearne C. C. Kammerer, CA Commissioner Gilinsky (For Distribution)

Transmitted: MNBB 3 7/5' P. Bldg 3 67 J. G. Davis, IE L. V. Gossick, ED0 H. R. Denton, .,

Region 177 3.k H. L. Ornstein, EDO R. C. DeYoung, NRR J. J. Fouchard, PA R. J. flattson, NRR N. M. Haller, MPA V. Stello, NRR (MAIL)

R. G. Ryan, OSP R. S. Boyd, NRR J. J. Cummings, 0IA H. K. Shapar, ELD SS Bldg 2 5 0 R. Minogue, SD W. J. Dircks, NMSS S. Levine, RES 1447 091 PRELIMINARY NOTIFICATION 7910129.h